BWR


Also found in: Dictionary, Thesaurus, Acronyms.

BWR

(nucleonics)
References in periodicals archive ?
He added: "With development of the UKs first BWR proposed just up the road at Wylfa Newydd, this scheme helps ensure that project is a springboard to the UK becoming a world power in its domestic expertise on BWR technology.
Pimjai and two Ladakhi nuns who were BWR participants.
Consequently, the control strategy of the ABC accounts for the facts that the BWR does change over time, and the mill power draw is related to ball volume, to provide a dynamic system to control ball addition.
In essence, one-half of the test items appearing on any particular exam are drawn from a test item bank from previously validated test items; to date there are 2291 items in the validated bank (1155 BWR and 1136 PWR), nose validated test bank items are entered into the respective BWR and PWR Generic Fundamentals Test Item Catalogs maintained by the Institute for Nuclear Power Operations (INPO) who disseminate the Catalogs to their member utilities.
We are excited to continue working to help Exelon Nuclear find innovative ways to reduce its operational costs by minimizing the critical path of outages throughout the BWR fleet," said Kevin Lagasse, senior vice president, nuclear services for GEH.
The Acquae range has three models, 400 x 400 BWR, 800 x 800 BWR and 630 x 630 BWR; Ignis two, 800 x 800 BWR and 1000 X 1000 BWR.
Hitachi GE has been working with AREVA to study the functions and performance of FCVS suitable for installation at BWR nuclear power plants in Japan.
Volume 3 of the three-volume second edition set covers current BWR reactor internals, license renewal and aging management, PWR reactor vessel integrity, PRA and risk based analysis, applications of elastic plastic fracture mechanics, international codes and standards, and ongoing issues of public safety (including a 40-year retrospective on the transportation regulations for radioactive materials), among other topics.
The first excursion was held for BWR participants on 7 August 2004 as stated in our timetable.
1 reactor, also a BWR, at its Onagawa nuclear power plant in Miyagi Prefecture, northeastern Japan.
The German bank's acquisition was made through the purchase of the entire issue of 235 million shares in BWR, at 1 Zloty per share.