critical path method

[′krid·ə·kəl ′path ‚meth·əd]
(systems engineering)
A systematic procedure for detailed project planning and control. Abbreviated CPM.

Critical path method

A construction scheduling device that diagrams the interrelationships between activities and identifies the critical path that optimizes the sequence of operations to minimize the construction period.

critical path method, CPM

A system of project planning, scheduling, and control which combines all relevant information into a single master plan, permitting the establishment of the optimum sequence and duration of operations; the interrelation of all the efforts required to complete a construction project are shown; an indication is given of the efforts which are critical to timely completion of the project.
References in periodicals archive ?
Schedule risk analysis simplified: Critical path method scheduling--some important reservations.
BKS is a privately-held, 31-person construction consulting firm based in Maryland specializing in critical path method schedule development, technical schedule review and progress evaluation, and will be an integral part of FTI's ability to provide a comprehensive construction industry dispute, litigation and investigations service.
Chapter 4: A Good Project Schedule is Needed: Critical Path Method Scheduling 101
Provide in programme evaluation review technique (PERT) & Critical Path Method (CPM) for the project and necessary clearances I approvals I compliances etc.
A Critical Path Method (CPM) Scheduling for small projects with ten activities or less and an overall duration of one year or less.
The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take.