LRU


Also found in: Acronyms, Wikipedia.
References in periodicals archive ?
However, due to the line speed requirement of ICN routers, the complexity of the cache replacement policy used in ICN is required to be O(1), making LRU as the default option.
The government would require FFF data for each LRU as well as FFF data concerning the interface between each LRU and the rest of the vehicle.
Step Description Identify each UUT component Component must be at the LRU level Identify potential failure modes each component All possible ways that the LRU can be foreseen to fail Identify any potential effect(s) of failure for each Direct and indirect events that can occur as a result of each LRU failure component Rank probability of SEVERITY of 0 = no effect likely, 1 = unexpected and hazardous effect very likely the effect (1-10) Evaluate potential cause(s) and/or mechanism(s) All possible scenarios that can lead to each failure for each LRU of failure Rank the probability of OCCURRENCE (0-1) 0 = scenario is unlikely, 1--scenario is highly likely List current design controls.
To put it mildly, the lowest level LRUs are cheaper than SSAs--and more readily available, for that matter.
LRU uses a cache which is a constant factor bigger than the online algorithm, its competitive ratio is constant (Bergh & Summerfield 1976) Not only does LRU have nice theoretical features, it also works well in practice.
According to the tests [15], LRU seems to be the best solution for caching large files.
For this single LRU, the cost avoidance for a reduction of 12 LRUs (major component) would result in a $1.
Information on their use of HIV-related health services and the status of their health with respect to HIV/AIDS-related illness, including time and year of diagnosis and admission, and outcome, at the QEH; follow-up at the HIV/AIDS clinic at the QEH RU (before 2002) or the LRU (after 2002); treatment, and adherence to treatment (if any); and deaths (if any) was collected from LRU and QEH medical records.
AFI and Engine Alliance will offer customer and product support services, supply chain management, logistics for component repair and LRU support, the companies said.
The units feature the key elements needed to test all levels of integration from SRU to LRU and iStudio[TM] development and debugging software.
LRU components are assembled and tested in a cleanroom environment to validate the cleanliness, alignment, and operation of these complex assemblies, before large robotic forklifts gently insert the LRUs into the beamlines from below.