Mahler

(redirected from Mahl)
Also found in: Dictionary, Thesaurus, Acronyms, Wikipedia.

Mahler

Gustav . 1860--1911, Austrian composer and conductor, whose music links the romantic tradition of the 19th century with the music of the 20th century. His works include nine complete symphonies for large orchestras, the symphonic song cycle Das Lied von der Erde (1908), and the song cycle Kindertotenlieder (1902)
References in periodicals archive ?
Mahl, in Desperate Deception, "the major purpose of BSC was to conduct aggressive offensive operations against those it saw as enemies of Britain.
von Hans-Joachim Mahl und Richard Samuel (Munchen: Carl Hanser Verlag, 1987), Band 3, Kommentar, p.
The Mahl Hydropower Project is to be located on dual boundary of Rawalpindi,Punjab and Bagh in Azad Jammu and Kashmir, downstream of Kohala Bridge and upstream of Dhalkot Bridge linking AJK with Punjab.
Os sistemas convencionais de cultivo, nos quais sao realizadas aracoes e gradagens, sao os que provocam maiores impactos na materia organica do solo, por promoverem alteracoes na temperatura, umidade e aeracao, rompimento de agregados, aumento no grau de fracionamento e incorporacao dos residuos vegetais e diminuicao da cobertura do solo (BAYER; MIELNICZUK, 1999; MAHL et al.
Vielleicht hat die Tatsache, da[beta] bei einem Mahl nur der ksattar- im Besitz eines Messers war, diese Inkongruenz [LANGUAGE NOT REPRODUCIBLE IN ASCII].
Mahl clearly shows how extensive British operations were and in the process very ably illuminates the complicated network of intelligence groups and leaders.
com President Jeffrey Mahl added, "We chose Maclendon as Official Financial Advisor for Grandparents.
In the past six months alone, over 20 percent of the new business we signed were takeaways from a competitor," says Chris Mahl, President of JWPlayer.
Susan Penzner, Nathan Stange and Thomas Mahl of Susan Penzner Real Estate represented the tenant in the deal.
Private Power and Infrastructure Board (PPIB) has received three bids for 590MW Mahl Hydropower Project costing $1 billion, says a press release.
It was also decided with consensus of Punjab and AJ&K governments that PPIB shall develop 590 MW Mahl Hydropower Project in the private sector.
Chris Mahl, the company senior vice president and chief brand alchemist, said 'SCVNGR's game layer is a natural fit for entertainment and National Amusements.