Record drawings

Record drawings

Construction drawings revised to show significant changes made during the construction process, usually based on marked-up prints, drawings, and other data furnished by the contractor to the architect.

record drawings

Construction drawings revised to show significant changes made during the construction process, usually based on marked-up prints, drawings, and other data furnished by the contractor to the architect.
References in periodicals archive ?
conduct field verification of the available "as-built" record drawings for the existing ers main control panel, control functions, and associated control wiring interfaces prior to demolition.
The 3D model was re-designed in Revit from existing record drawings by the BAM Team including the MEP model.
This includes any record drawings of the building and associated systems.
Three out of the 10 specifications have material, product data and equipment section; two specifications have a record drawings and closeout section.
Effectively, what we have done is get in there and make record drawings and photographs of features of the building.
Indisputably the French Baroque artist most beloved by British collectors, Lorrain is represented in the exhibition by five works--selected from among 500 in The British Museum's collection--which demonstrate the range of his production, from free plein air studies to the breathtakingly fresh images from Liber Veritatis, in which he made record drawings of his completed paintings.
Stivaly continued: "On-site engineers went right to the drawing board, filing their record drawings quickly and as the job proceeded.
The agency constructing the system claimed that it should retain the record drawings and technical documents.
Request for qualifications: design the improvements, prepare bid documents, obtain required permits, provide bidding assistance, assist in construction contractor selection, provide construction management services, review shop drawings, answer contractor requests for information, authorize pay requests, prepare record drawings, provide operation and maintenance manuals, assist with start-up, and certify completion of construction.
Utility owners, consultants and contractors prepare record drawings which simply are construction drawings that have survey data recorded on them.
NYCT gave permission to review the record drawings for the construction of the subway lines that run underneath St.