Printer Friendly
Dictionary, Encyclopedia and Thesaurus - The Free Dictionary
3,919,549,231 visitors served.
forum Join the Word of the Day Mailing List For webmasters
?
Dictionary/
thesaurus
Medical
dictionary
Legal
dictionary
Financial
dictionary
Acronyms
 
Idioms
Encyclopedia
Wikipedia
encyclopedia
?

Trail
(redirected from Trail construction)

   Also found in: Dictionary/thesaurus, Medical, Legal, Wikipedia 0.01 sec.
Trail, city (1991 pop. 7,919), SE British Columbia, Canada, on the Columbia River just N of the Wash. border. It is a metal-smelting center for a mining area that produces lead, zinc, silver, and gold. Sulfuric acid and fertilizers are manufactured there.
trail
1. the scent left by a moving person or animal that is followed by a hunting animal
2. Engineering the distance between the point of contact of a steerable wheel and a line drawn from the swivel pin axis to the ground

trail [trāl]
(astronomy)
A luminous trace left in the sky by the passage of a large meteor.
(geology)
A line of rock fragments that were picked up by glacial ice at a localized outcropping and left scattered along a fairly well-defined tract during the movement of a glacier.
(graphic arts)
One of the lines left on a photographic plate during prolonged exposure to starlight if the motion of the plate was not synchronized with the apparent motion of the sky.
(ordnance)
In bombing, the line between the point of impact of the bomb and a point on the ground directly beneath the aircraft at the moment of impact, assuming that the aircraft stays on course after release of the bomb and maintains a constant speed.
Rear part of a gun carriage which connects the piece with a limber or tractor.

Trail 

a city in Canada, in the southern part of the province of British Columbia. Population, 11,100 (1971). Trail is a center for the extraction and processing of complex ores. It has a large smelting combine that produces one-half of Canada’s smelted zinc and two-thirds of the country’s smelted lead; antimony and other metals are smelted as well. Trail also produces chemicals.



Want to thank TFD for its existence? Tell a friend about us, add a link to this page, add the site to iGoogle, or visit the webmaster's page for free fun content.
?Page tools
Printer friendly
Cite / link
Feedback
Mentioned in?  References in periodicals archive?   Encyclopedia browser?   Full browser?
No references found
 
SPRINGFIELD EWEB Bike Trail construction will include installation of posts throughout the week from Pioneer Parkway to 31st Street.
The 3/4-mile project is the second phase of trail construction along the river and will connect the existing trail section that ends at Alto Park, downstream, to the existing trail section that stretches from Ricardo Road to Camino don Jose.
Elihu Gillespie has spent 26 years as a parks and recreation professional, most recently as a leisure services manager, overseeing trail construction, maintenance, athletic services, and recreation.
 
 
 
Encyclopedia
?

Terms of Use | Privacy policy | Feedback | Advertise with Us | Copyright © 2012 Farlex, Inc.
Disclaimer
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional.