At the moment railway contact network is being reconstructed on the Guzdek-Sumgait section, and 69 piles, 6 reinforced concrete piles, 6 anchor piles, 41 cantilever piles, 3
cavity ties have been installed, Abbas Gemberov, head of Capital Repair LLC, told Trend.