Approach procedures are named according to the type of navigation system used to provide lateral guidance in the
final approach segment (such as VOR, NDB, ILS, LOC, or RNAV).
When the weather's at minimums, is the
final approach segment really the best time to call Unicom about the rental car?
It also assists the flight crew in properly timing the deceleration to final approach speed, configuring the aircraft for landing and properly spacing aircraft on the
final approach segment just prior to landing.
COSUV marks the beginning of the
final approach segment on the full ILS--note the lightning bolt.
Misinterpreting this rule might have prompted the following addition to AC 90-66, "pilots conducting instrument approaches should be particularly alert for other aircraft in the pattern so as to avoid interrupting the flow of traffic, and should bear in mind they do not have priority over other VFR traffic." The confusion could arise from final approach to land versus
final approach segment.
While you're on downwind, look ahead and below and visualize the
final approach segment. I used to tell my students, while on downwind, to look at the runway and use it as a yardstick to select a point on the ground to begin the final segment.
The title of the approach indicates what equipment is required to fly the
final approach segment (FAS).
The
final approach segment begins on the FAC 10 nm out.
Nav 2 becomes a backup for the
final approach segment.
When conducted in IMC and the aircraft transitions from IMC to VMC on the IAP's
final approach segment prior to or upon reaching MDA or DA/DH.
During the
final approach segment pilots reference minimums and the missed approach.
As a result of this accident, the vertical descent angle (VDA) for the
final approach segment of non-precision approaches began to be included on published instrument approach procedures.