additive alternate

additive alternate

An alternate bid resulting in an addition to the same bidder’s base bid. Also see alternate bid.
References in periodicals archive ?
one (1) pbb and associated gate equipment will be relocated from concourse a, gate a3, and the second pbb and associated gate equipment will be furnished and installed in this contract as an additive alternate.
Tenders are invited for drainage structures, class ii base course, portland cement concrete pavement, drilled shaft foundations, landscaping; additive alternate 1 (additional streetscaping): benches (park); additive alternate 2 (gateway signage): sign (gateway); and related work.
Tenders are invited for drainage structures, milling asphalt pavement, asphalt pavement patching, concrete pavement patching, asphalt concrete overlay, additive alternate 1 barrilleaux st.
Tenders are invited for cleaning and performing cctv inspection on approx 8,164 lf of 18" to 36" pipe; 6,285 lf of 8" to 24" pipe for additive alternate 1; and 4,173 lf of 24" to 30" pipe for additive alternate 2.
base bid: mobilization and bio security, remove/reinstall existing pumps, video well before and after cleaning, electro blast well, brush and bail well, furnish and install indoor vfd and panel, install 12" saddle flow meter wells #1 - #3, and install 6" saddle flow meter for well #4; additive alternate no.
Tenders are invited for project will consist of installation of a new emergency generator and additive alternate to upgrade existing motor control center.
an additive alternate includes sludge removal from the existing ponds so as to provide the proper environment for the new aeration system.
if additive alternate 1 is accepted contractor will not re-fed the existing electrical system 2 back to new electrical system 1.
additive alternate bid shall include approx 770 sy of unclassified excavation and installation of a new compacted base and hma surface course between existing curb and gutter.
additive alternate 1 consists of repairing and roofing approx.
there is also an additive alternate that includes an additional 700 lf of roadway that will provide a second entrance.
the estimated cost for the additive alternate a schedule of this work ranges from $ 300,000 to $ 400,000 .