cellar deck

cellar deck

[′sel·ər ‚dek]
(petroleum engineering)
The lower of the two decks of a double-decked semisubmersible drilling rig.
References in periodicals archive ?
Therefore, a number of renovation and restoration work includes: cellar deck, sewer, elevator, outdoor lift, new radiators throughout the building, ventilation, plumbing, electricity, cts, technical installations for the exhibition, various carpentry and masonry, floor work and renovation of floors mm.
Durastic, which has branches in Jarrow, as well as Liverpool and Southampton, will supply and lay its fire-retardant underlay and flooring products in the cellar deck of a new platform under construction for BP's PS4.
The North Sea platform's cellar deck will be laid with 528 sq metres of Durastic lightweight underlay.
LIVERPOOL marine flooring manufacturer Durastic has won a supplyand-installation deal on a new North Sea platform Durastic, which has branches in Liverpool, Jarrow and Southampton, UK, will supply and lay its seamless, fireretardant underlay and flooring products in the cellar deck of a new platform under construction for BP's PS4.
The pre-drilling wellhead deck of 14 x 14 x 4 meters, will accommodate the phased development of the Dagny field and will eventually be integrated into the topsides cellar deck.
He said: "I saw a rope and tied myself on to it and dropped over the side to the cellar deck.
Construction work has already begun with the initial focus on plate girders fabrication and cellar deck panel assembly.
Durastic, which has division in Liverpool, Jarrow and Southampton, UK, will supply and lay its flawless, fire-retardant underlay and flooring products in the cellar deck of a new platform under construction for BP s Au4.
Additional features including a high capacity deck crane, significantly enlarged cellar deck area and a 25' by 90' moon pool will provide enhanced subsea completion and development capabilities.
Durastic will deliver and lay its seamless, fire-retardant underlay and flooring products in the cellar deck of the new platform, under construction for BP s Clair Ridge oilfield, near the Shetland islands.
h) appropriate establishment of bromembran of cellar deck incl.
dkThis rENhusentreprise include 1) Concrete work, in-situ, including a) Line and point foundationsb) Lift Gruberc) Basement Exterior and interior wallsd) Access rampse) Ground levelf) Space molded deckg) Reinforced concrete of the cellar deckh) Decrease Building for bromembran of cellar deck incl.