cement screed

cement screed

A screed of cement mortar.
References in periodicals archive ?
This makes the system incredibly strong and protects the relatively low chemically resistant sand and cement screed.
Approximately 1 000 m2 underground sweep off;- Approximately 1 000 m2 insulation;- Approximately 700 m2 cement screed C 35;- Approximately 300 m2 cement screed C 35-H (heating screed).
A limited palette of finishes simplifies detailing - light ochre-coloured cement rendering to the walls combines with polished ochre-pigmented cement screed to floors and built-in furniture.
OP-extension: - Approximately 280 m2 screed on separating layer, cement screed CT-C35-F5, H 70 mm, traffic load to 5 kN / m2;- Approximately 495 m2 composite screed, cement screed CT-C35-F5, H100 mm, traffic load to 5 kN / m2;- Approximately 580 m2 cement screed CT-C35-F5 as floating screed, total height to 120 mm;- Approximately 580 m2 Impact sound TSD EPS in different strengths;- Approximately 580 m2 thermal insulation WD, EPS and XPS in different strengths;- Approximately 280 m2 floor coatings, dust-binding Anstrich.
Compensation beds, cement screed for underfloor heating.
Screed works consisting of din 18353: - cement screed with thermal and sound insulation (about 2 100 m2).
Major achievements - Approximately 1 000 mA of floor construction,- Horizontal sealing against soil moisture (bitumen sheet)- Impact sound insulation,- Cement screed (80-95 mm thick)- Approximately 650 mA hard aggregate screed, later in the composite,-.
1 is the screed works and floor coatings in BA1The main benefits are Screed floors Cement screeds in composite approximately 3900 mAO;Cement screed floating about 600 mAO;Floor coatings OS8 / OS10 in the underground car park about 1200 mAO; Epoxy coating of 650 m2 (including 350 m2 dissipative);Mineral coating as wearing surface with surface coating approximately 3900 mAO.
200 m2 wall tiles pool + 230 m2 cement screed 265 m2 wall tiles wet areas
Installation of cement screed in different qualities, sealing work in houses without buildings.
Heated screeds as cement screed on existing floor structure, approximately 510 mA;
Cement screed on insulation about 11 000 m2, epoxy resin sealing 300 mA.