deck drain

deck drain

A drain that is similar in all respects to a roof drain except that it generally has a flat strainer and is located in a flat area such as a patio, walkway, etc.
References in periodicals archive ?
It is packed with features, including a 4-foot deck with pedestal base and trolling motor bracket, under-deck storage, front deck drain, rear driver's box and grab bar, 18-inch sides and a 21-inch angled transom for enhanced performance in reverse.
An integral deck drain is on the back edge of the stainless steel gutter.
This AD requires modification of the canted pressure deck drain system in the wheel well of the main landing gear and is effective 13 December 2000.
Standard features include a trolling-motor bracket, front deck drain, rear heavy-duty driver's box and grab bar, and an angled transom for better performance when in reverse.
Tenders are invited for Spares For Equipments Helo Monorail, Circulating And Cooling Sea Water Plant, Piping And Drainage System And Deck Drain System
Tenders are invited for work includes: 3 ea - type iii barricade, 73 sf - temporary pavement marking (paint), 1,840 lf - temporary railing (type k), 7 ea - temporary crash cushion system, 93 ea - storm water sampling and analysis day, 19 ea - remove marker, 900 lf - remove guardrail, 1,280 lf - remove painted traffic stripe, 15,015 sf - place polyester concrete overlay, 8 ea - plug deck drain, bridge removal, 96 lf - 24" alternative pipe culvert, 4 lf - 36" corrugated steel pipe inlet (.
Tenders are invited for Profiling and grinding asphalt, placement of tack coat and asphalt pavement, raising or capping surface deck drain structures to new grades, construction survey, adjust storm drain and utility vault lids, remove, modify, and reinstall expansion joint plates and placement of high performance grout.
Tenders are invited for Maintenance of traffic; 8 EA of pavement message paint; 2 EA of deck drain modification; 5 EA of pedestal repair; 926 FT of parapet sealing; etc.
The major items of work are as follows: Removal and replacement of asphalt and waterproofing membrane on bridge deck and approaches to the limits notes on the drawings; Cold planing of concrete deck and placement of concrete overlay; Removal of expansions joints and approach slabs to allow for semi-integral abutment conversion; Removal of railing system, curbs and deck overhangs and installation of new deck overhangs, barriers, and railing system; Removal of existing deck drain piping; Miscellaneous spot repairs to existing deck, abutments, piers, soffit, and girders; Modify approach guardrails; Installation of new approach curb and gutter; and Application of protective coatings to identified elements.
Tenders are invited for rehabilitate the existing hatch covers (operating deck) for units 18, 19 and 20, clean and test deck drains, repair expansion/contraction joints, concrete patching, substrate preparation, membrane waterproofing, repair heat tracing boxes and conduit.
The pool deck will need to be cut back several feet in order to lie three inches inside the property line, and the pool deck drains moved east about a foot.