desander

desander

[dē′san·dər]
(engineering)
A centrifuge-type device for removing sand from drilling fluid in order to prevent abrasion damage to pumps.
References in periodicals archive ?
Invitation to tender:The KW Gere Los 1a comprises the construction of a weir in Bergbach Gerewasser (9m high, 15m wide), a fence building (with an internal Tirolerwehr with 12m2 faults), a desander (50m long, 4m wide, 6m high) and a portal building with its precut.
He inspected the construction activities on the weir site located in Nauseri - 41 kilometres east of Muzaffarabad besides the main dam, composite dam, desander, and sedimentation basin and debris channel.
For the construction of Desander and Collecting Canal 100% excavation work has been completed.
USPRwire, Fri Feb 13 2015] Solid Control Equipment Market by Types (Shale Shakers, Mud Centrifuges, Desander & Desilter, Mud Cleaners, and Others), by Application Areas (Onshore & Offshore), & by Geography - Global Trends & Forecast to 2019
Khawaja Mohammad Asif expressed deep grief and sorrow over the loss of precious lives of the workers due to collapse of desander wall during reinforcement of steel on a 24meter long section this morning.
These devices can remove particles with a size of 30 microns and are composed of three parts: desilter, desander, and shale shaker.
For Kohala Hydropower Project site, data of fourteen (14) boreholes of dam area, desander, diversion tunnel and powerhouse area have been used as per procedures of ASTM D5878-08, 2008.
Desander & Meco unit (Manufacturer Eltron Chromalox Ltd/Krebs Engineer/Meco).
Godwin Dri-Prime pumps are used in directional drilling applications to pump drilling mud to desander units and to clean/reuse and remove drilling mud from the fight-of-way.
The contract includes a Subsea Separation Boosting and Injection system incorporating a retrievable separation module, manifold module, desander system, multiphase and water injection pumps and a water injection tree.
Tenders are invited for Includes in general but not limited to Project Management, Surveys (pre-engineering, pre-construction/pre-installation and post-installation), Residual/Detailed engineering, Procurement, Fabrication, Load out, Tie down/Sea fastening Tow-out/Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning, Commissioning of Desander facilities on LSTK basis as described in detail in the tender document.
C[yen] The 1500 psi cyclonic desander utilised in the Tukau field is up to 98 per cent effective in sand removal.