desilting basin

desilting basin

[dē′sil·tiŋ ‚bā·sən]
(civil engineering)
A space or structure constructed just below a diversion structure of a canal to remove bed, sand, and silt loads. Also known as desilting works.
Mentioned in ?
References in periodicals archive ?
Tenders are invited for Fabrication supply and testing of portable desilting basin table model at cwprs pune
Work DescriptionC/O Diversion Weir, Inlet chamber, Side wall/ guide wall, Desilting Basin, Collection Chamber, Retaining wall, Pressure Hydrant Chamber, Sluice Valve chamber, Nallah Crossing, Road Crossing, Main and Distribution Pipe line System, Sprinkler System
Work DescriptionC/O Head Weir, Inlet Chamber, Feeder Pipe Nalla Crossing, Desilting Basin, Main Pipe Line, Collection Chamber, Distribution Line, Distribution Chamber, Pressure Break Chamber, Sluice Valve Chamber, Retaining Wall, Portable Sprinkler
Tenders are invited for C/O Diversion Weir and Inlet Chamber, Desilting Basin, Control /Sluice valve Chamber, Pressure Hydrant Chamber, Collection Chamber, P/L Main Pipe Line System, P/L Distribution Pipe Line
Work Description C/O Diversion weir, Guid Wall, Retaining Wall, Desilting Basin, Silt Retention Structure, Control Sluice valve Chamber, pressure hydrant Chambers, Storage Tank,Collection Chamber,Pressure hydrant Chamber,Main Pipe line
Work Description C/O Diversion Weir, Inlet chamber, Side wall, Retaining wall, Desilting Basin, collection Chamber, Storage tank, Pressure Hydrant Chamber, Nallah crossing
Tenders are invited for cleaning of deposited materials from bindu khola water way, open desilting basin, open channel along with recasting of base concrete of open desilting basin no.
Tenders are invited for cleaning and upkeeping of desilting basin at rammam intake and forebay area under rhp st-ii
Tenders are invited for C/O Diversion weir, Retaining Walls, Feeder Channel, Main Channel, Desilting Basin, Collection Chamber, Nallah Crossings, Pressure Hydrant Chambers, Control Valve Chamber, P/L Main and Distribution Pipe Line
Tenders are invited for Removal of silt from desilting basin at headworks including restoration of catch water drain on uphill side and concreting at right side of the desilting basin CHP-I