door schedule

A tabulation, usually on a blueprint or in specifications, which lists all doors required on a job, indicating sizes, types, locations, and special requirements.
References in periodicals archive ?
Tenders are invited for install bladder surge arrestor for fire sprinkler system bldg 993 option #1: replace fire rated and non fire rated doors - see attached door schedule listing 85 door openings option #2: refurbish vet clinic - remove & reset furniture, replace door to surgery room with double acting swing, replace entry door & frame, drywall work, cabinet with sink, replace flooring with epoxy anti-microbial flooring system, repair eight (8) existing windows, relocate t-stat, provide supply & return vents, replace all light fixtures with new led fixutes option #3: replace fire riser valves & other misc.
Laois never really got out of the blocks yesterday as their hectic back door schedule of five games in seven weeks finally caught up with them.
Tenders are invited for Demolish and reconstruct toilet rooms at the following buildings: The work to include all required electrical and plumbing; new walls where indicated; new doors and frames; new toilet accessories, finishes and signage; replace other doors and or hardware, as required in the Door Schedule in four facilities; install new concrete ramps, where indicated in the Irvine Fine Arts Center and Deerfield Community Center; install new pipe, hand rails, new signage as detailed, new ADA lift in Heritage Community Center, and High Low Drinking Fountains in three facilities; and other items
When a door schedule change is needed, the department head who has approved the special program must make a request in writing to the security department.
Logistics providers need this information to help plan loads, equipment, pickups/deliveries and dock door schedules to ensure they can deliver the right product at the right time.
Either must be coordinated with the architect to be sure they are included in door schedules on architectural drawings.
From this station, MFCU can modify door schedules, view and acknowledge alarms, open and close controlled doors and gates, add and delete cardholder records, and control personnel access.
A drawing list might include a system block diagram, equipment locations and sensor coverage, console layouts, installation details, door schedules, wire lists, concrete foundation sections, and power distribution single-line diagrams, for example.