elastomeric bearing

elastomeric bearing

An expansion bearing fabricated of an elastomer, which permits movement of the structure it supports.
Mentioned in ?
References in periodicals archive ?
Petty Officers Davis and Shumpert discovered a hairline crack in the upper elastomeric bearing of the black-blade, pitch-control rod.
Each girder is supported on elastomeric bearing pads with shear keys to provide transverse constraints.
The system consists of a ball, a socket, and an elastomeric bearing pad similar to those used on large buildings and bridges.
The spans are fixed on the south end and allowed to expand on the north, resting on 1 th" sole plates and 4" elastomeric bearing pads.
Tenders are invited for Replacement Of Elastomeric Bearing On Psc-Box Girder Bridge No.
Tenders are invited for supply of 80 nos elastomeric bearing of 560*400*96mm for construction of mampuram bridge across kadalundi river in malappuram dist.
Hands-on training was offered at many conferences, including elastomeric bearing inspection, FADEC troubleshooting, composite material insert familiarization and cable connection/coax repair.
8 miles north of US50: Replace with elastomeric bearing pads; remove and replace abutment backfill.
7 mm dia 7 ply class II strands conforming to is 14268 1995 anchorage cone 12 T 13 bearing plate for 12T 13 Profiler 12T 13 Prestressing Wedges %A% Type Master Wedges %A% Type,Pot fixed and Pot Sliding Bearing of 400 Mt capacity of Mosrt & H Specifications as per IRC-83(Part-III)-2002 Section IX Drainage Spouts Expansion Joint & Elastomeric Bearing for Super Structures of 50 Mtr Span Major PMT Bridge at Km 131 15 on Phusentsholing Thimpu Road and 24 MT Span RCC-Beam Bridge at Km 38.
Tenders are invited for Rajkharswan- Sini Section - Provision and Fixing in position of Elastomeric Bearing of Composite Girder and other misc.
Structure excavation elastomeric bearing pad psc member type i girder(launching only) stone masonry rubble concrete billboard const.
Production of a single-span bridge lw = 20 m of prestressed concrete with 2 separate superstructures on elastomeric bearings for transferring the A33 motorway over a body of water;- Shallow foundation;- Production in 2 phases, abutments and foundations completely separated by spacer gap;- Preparation of a construction site crossing of the 1st phase of construction;- Take account of specific nature protection regulations by proximity to a conservation area.