marine bridge

marine bridge

[mə′rēn ′brij]
(geology)
Mentioned in ?
References in periodicals archive ?
Tenders are invited for Providing Consultancy For Carrying Out Feasibility Study, Survey And Investigation, Alignment Options, Preparation Of General Arrangement Drawings, Engineering Report For Construction Of Proposed Marine Bridge Between Beyt Dwarka And Okha
It comprises two discrete elements, the first of which is the main causeway, which is currently under construction, linking the Shuwaikh Port area and the Subiyah New Town area to the north, with total length of 36km of which 27km is marine bridge structure, reported the Kuwait News Agency .
He then met with a marine bridge stationed at the Aktau garrison.
4km-long, 100m-wide reclaimed causeway, two marine bridge crossings and a separate loop-shaped flyover, primarily to allow for free-flow entrance to the growing Business Bay district.
The Arriva Stadium manager believes he is bringing together a squad that can help Marine bridge the gap to those sides who are able to splash the cash.
However, the Marines do not have a designated bridge-building MOS, which means that a Marine bridge company is fundamentally different from an Army bridge company.
We expanded into heavy civil construction, such as marine bridge structures, locks and dams, which led to highway work in association with bridges.
The design of the elevated roadways and marine bridge crossings incorporated corridors for light-rail transportation, pedestrian walkways, public realm landscaping and a major underground metro and high-speed rail station, "thus creating a sustainable integrated transport system for the development," explains Al Muti.
Marine bridge companies, prime power detachments, firefighting teams, well-drilling detachments, and several other separate engineer companies.
The Marine Bridge System Displays feature anti-shock, anti-vibration, anti-corrosion protection and can be customized to include options such as integrated touch screens, sunlight readability enhancements, wide voltage range input, and are available in sizes 10.
AIS' Rugged Vehicle Display, Marine Bridge Display, and Rugged Rack Mountable Display features shock and vibration resistant compliance up to MIL-810F Environmental Engineering standards.
Construction work related to the upper flyover of Um Al Hassam Junction and the two western marine bridges (flyovers) will be completed by the end of Thursday, July 15th 2010 and the first phase of the project will be opened to traffic on Friday, July 16th 2010.

Full browser ?