material balance

material balance

[mə′tir·ē·əl ′bal·əns]
(chemical engineering)
A calculation to inventory material inputs versus outputs in a process system.
References in periodicals archive ?
The purpose of creating the program was the need for a unified algorithm that would take into account all the necessary benchmark data, perform material balance calculations and find optimal ways in short-term and long-term planning.
According to the scheme the material balance of calcium compounds can be represented by marking C as the total concentration of calcium compounds in the solution, as follows:
The material balance equation is fortunately simple enough (after our simplifying assumptions) that it admits an analytical solution.
The results showed that although the Flowing Material Balance method is unable to evaluate the reservoir parameters it is more powerful in estimation of oil in place rather than the Blasingame method.
Founded in 2000, SiteLark develops solutions to extract information from available data to enrich reservoir simulation models, builds predictive models for unconventional gas and performs a variety of engineering studies related to fluid characterization, material balance, decline curves and pressure transient analysis.
Using the material balance method of analysis, the Division of Oil and Gas estimates there is 355 billion cubic feet of undeveloped gas resources in three large fields.
The Director General of the IAEA has to report the detailed information on weapon grade nuclear material, including high enriched weapons and plutonium, their locations and contiguous accountancy of material balance.
A set of material balance equations allowed the estimation of the SDS fraction in the micelles.
The material balance for oil shale retorting in the pilot retort is shown in Table 2.
In addition to several new features to provide operations with even more confidence in production data, this version provides updates to the custom reports and analytics module for enhanced performance, along with improved material balance and stockpile management to streamline reconciliation and end-of-month processes.
The NTSB also cited a list of control room inadequacies, including a lack of training of personnel leaving them unable to correctly identify the cause of the Material Balance System (MBS) alarms.
It has to be based on material balance or reserves, natural resources and mineral production all over Indonesia.

Full browser ?