pressure survey

pressure survey

[′presh·ər ‚sər‚vā]
(mining engineering)
A study to determine the pressure distribution or pressure losses along consecutive lengths or sections of a ventilation circuit.
(petroleum engineering)
The measurement of static bottomhole pressures in an oil field with producing wells shut in for a time interval sufficient for reservoir pressure buildup to stabilize.
References in periodicals archive ?
OGDCL's average net saleable gas production stood at 987MMCF per day which has been affected primarily owing to natural depletion in addition to high water cut at certain wells of Qadirpur field, ATA, pressure survey jobs and delay in plant start-up activities at KPD field and less gas intake from Uch-II field - shut-in of turbines of UPL-II with effect from August 31, 2017 to September 13, 2017.
Tenders are invited for Procurement of ventilation pressure survey set
in for a short period of time to allow for a pressure survey to be run and was placed back on stream with a contribution for half a day to total daily production from the field.
The Pregnancy Pressure survey by Norwich Union Healthcare found that 28 per cent of women felt they were under social pressure to lose weight after giving birth.
The Pregnancy Pressure survey by Norwich Union Healthcare found that 28% of women felt they were under social pressure to lose weight after giving birth.
The Pregnancy Pressure survey by Norwich Union Healthcare found that almost half of mothers (45%) said that after having their baby their main concern was to lose the weight they had put on during pregnancy.
Upon review of a recent reservoir pressure survey, the Alberta Energy and Utilities Board ("AEUB") has decided that a pressure maintenance program is necessary to optimize ultimate recovery from the Pekisko pool.
3) Pressure surveys of commercial customers to determine the actual supply pressures against contracted pressure.
Its 17, 000-plus employees have access to a number of programmes including driver risk assessment, pressure surveys and health screening as well as drives to cut the number of accidents in the workplace.
The remaining 4 wells are shut-in for various reasons including completion operations, installation of additional gathering lines/equipment, bottom hole pressure readings, formation pressure surveys, and additional workover, water injection and stimulation operations to bring wells on production.
The forward operation is to conduct a test of the middle zone and further pressure surveys.
It comprises of 1) reducing gas pressure manually during off-peak hours but maintaining optimum pressure within the entire system, 2) checking/replacing meters not recording consumption appropriately, 3) undertaking pressure surveys of commercial customers to determine the actual supply pressures against contracted pressure and 4) load survey of industrial consumers.