A checklist of all items on a construction project that are unfinished or incomplete, have not been done at all, require replacement or repair, or require additional work to achieve an acceptable level of workmanship. Such a list is often established as a result of periodic inspections at the job site during construction and may be included in field reports. All items must be corrected by the contractor in a timely fashion so that the finished construction job conforms to the contract documents.
References in periodicals archive ?
If architects manage the punch list, often they do so within the context of the punch list software.
HomeWorx, an outsourced service that assumes the final walkthrough and punch list process, so customers receive thorough, consistent orientations from trained service representatives.
Also, some trades are comfortable doing punch list and never want to leave.
As a result, all information on schedules, punch lists, companies and contacts can be automatically synchronized and updated on both the Vela-enabled Tablet PCs and in Meridian applications.
HomeWorx is a convenient service that turns the entire final home walkthrough and punch list creation process over to trained customer service professionals.
They did a superb job of analyzing the opportunity for Punch List in our target markets, and they helped us frame the strategy for our new line of Digital Power Tools.
A central tag-based punch list reduces errors and eliminates duplication.
Punch list at substantial completion, or- when directed by Owner.
Delays in work on the East Front, the Exhibit Gallery, and the House Hearing Room also pose risks to the project's schedule, as do the many items on the project's punch list and a steady number of proposed change orders.
We maintain that reputation by paying our bills on time, finishing our jobs on schedule, turning them over, with punch list items completed, by the completion date, and managing the process with frequent meetings and updates to all parties, which is why subcontractors are willing to work with our firm.
0's new Punch list module allows for complete management of the punch list process.
This project provides for the completion of the storm drain system per the Los Angeles County Public Works Department~s standards, which includes construction of debris barriers, modification of de bris basins and storm drains, and miscellaneous punch list work as well as eas ement preparation and processing.