rubble concrete

rubble concrete

1. Concrete similar to cyclopean concrete except that small stones (such as one man can handle) are used.
2. Concrete made with rubble from demolished structures.
References in periodicals archive ?
5 mm - estimated quantity of 5 000 tonnes,rubble - recycled crushed aggregate (concrete rubble concrete przekruszony) of fractions from 0 mm to 63 mm continuous grain size - the estimated amount of 11 608 tonnes,The aggregate must not contain organic impurities,components harmful for the environment (e.
The collapsed parts have been filled with rubble concrete in order to maintain the pavement.
Invitation to tender : 50 m3 concrete; Dry stone cladding 80 m2; Demolition rubble concrete walls with 50 m3; Repair masonry 1~100 m2
Invitation to tender : 45 m3 concrete; Foundation material 45 m3; Demolition rubble concrete walls with 35 m3; Basement excavation / backfill 120 m3;
There are a total of about 66 800 tonnes of excavated materials which result mainly from the road and sewer construction - a total of about 52 700 tonnes of soil or soil-building rubble mixtures: mostly sand with minor to significant amounts of mineral impurities, single piles with clay mixed (> 90% Z1 and Z2 materials, ancillary> Z2 and Z0) - total about 12 700 tonnes rubble concrete, Rotstein (> 95% Z1 material) - a total of about 1 375 t of other materials: u.
There are a total of about 66 800 tonnes excavated materials, which are mainly attributable to road and sewer construction - A total of about 52 700 tonnes of soil or soil-rubble mixtures: predominantly sands with minor to significant amounts of mineral impurities, individual piles with clay mixed (> 90% Z1 and Z2 materials, subordinated> Z2 and Z0),- A total of about 12 700 tonnes rubble concrete, Rotstein (> 95% Z1 material),- A total of about 1 375 t of other materials: including rails, sleepers, ballast, asphalt, cinder blocks, old wood, KMF.
Store masonry for footing, Rubble concrete, "Class B" in place, boulder fill & filler in place, cofferdam and embankment.
demobilization field office removal of structures & obstructions structure excavation embankment dredging of sited river basin structural concrete stone masonry rubble concrete
The main cubatures are: Excavation 900 mA; work platform 200 mA, bridging structure 70 m; demolition prefabricated concrete elements 70 mA; hydrodynamic concrete removal area 1,000 mA / volume removal 25 mA; rubble concrete 150 mA; structural concrete 500 mA shotcrete 20 tons; rebar 65 tonnes; formwork 1,200 mA; biased, permanent ground anchor (150 pieces) 3,400 m; surface protection system 1~700 mA; covering 240 to; scaffolding 1,200 mA; replacement dirty water pumping line 170 m.