Agha Jari

Agha Jari

 

center of a large petroleum field discovered in southwestern Iran in 1943—44. It is connected by an oil pipeline with an oil refinery in Abadan. The oil field is being worked by an international oil consortium in which the USA, Great Britain, the Netherlands, and France are participating. In 1960, Agha Jari provided 64 percent of all the petroleum extracted in Iran.

Mentioned in ?
References in periodicals archive ?
Agha Jari, having a capacity of 200,000 b/d and a gas-based EOR system, with reserves of 17bn bls.
Agha Jari was found in 1936 about 90 km south-east of Ahwaz but production did not begin until 1945.
About 80 MCM/d of their sour gas are injection into Agha Jari oilfield, with 1.
EeEe Located in Khozestan province south of the country Kanage and Parsi oil fields are administered by Agha Jari Oil and Gas Exploration Company.
Upper Cenozoic clastic rocks assigned to the Agha Jari and Bakhtyari formations are exposed at the fold crests (Fig 2).
Major Iranian oilfields Average On or production Oilfield Offshore (b/d) Ahwaz Asmari Onshore 700,000 Gachsaran Onshore 560,000 Marun Onshore 520,000 Bangestan Onshore 245,000 Karanj Parsi Onshore 200,000 Agha Jari Onshore 200,000 Rag e Safid Onshore 180,000 Dorood Offshore 130,000 Salman Offshore 130,000 Bibi Hakimeh Onshore 130,000 Abuzar Offshore 125,000 Sirri A&E Offshore 95,000 Pazanan Onshore 70,000 Soroush and Nowruz Offshore 60,000 Source: United States Energy Information Administration
The fields to be offered for re-development will be the main crude oil producers, including Gachsaran, Agha Jari, Marun and Karanj-Parsi - as well as those sharing the huge Bangestan reservoir: Ahwaz, Abe-Teymour and Mansuri (see omt15IranFieldsApr8-13).
The Bid Boland plant processes 800 MCF/d of gas from the Agha Jari oilfield, from where it is taken through a 40-inch pipeline.
Decentralised under a holding company, NIOC South (also known as NISOC) has four geographical units: Marun, Karun, Masjid-e-Suleiman and Agha Jari.
Phases 6-8, to produce 80 MCM/d of sour gas for injection into Agha Jari oilfield, 1.
An important volume of South Pars gas production is dedicated to the depleting Agha Jari oilfield.
Phases 6,7 and 8 are identified as key projects for supplying gas for reinjection into three key oil reservoirs requiring pressure maintenance - Agha Jari, Ahwaz and Mansouri.