BACP

(redirected from BAPC)
Also found in: Acronyms.

BACP

(Bandwidth Allocation Control Protocol) An IETF standard for adding and dropping the second B channel during an ISDN session. Working in conjunction with Multilink PPP, it enables sending and receiving devices to negotiate the required bandwidth.
References in periodicals archive ?
the purchase of asphalt mixtures type ba 16, Bapc 16, Bapc 8 is desired, For the self-execution of some maintenance and repair of public roads by the release of asphalt carpets and fillings in order to maintain part of the viability.
Participants were asked to complete at their own pace questionnaire packets containing the CLSI, BAPC, RSES, and a background information form.
Under these conditions, the crystallization rate of BAPC was strongly enhanced to match that of highly crystalline polymers such as polyolefins and polycaprolactam.
Funding has been allocated from the EuropeanSocial Fund, allowing the BAPC to help fledgling and existing businesses, in agreed regeneration areas, across the West Midlands.
The BAPC has been found to be moderately correlated at -.38 with the I-E scale developed by Rotter (1966).
Before the differences between PS and BAPC can be understood, the stress-optical behavior must be explained in more detail in relation to the thermo-mechanical loading of the material during molding.
Total quantity or scope: The contract aims to achieve the objective construction works "Modernization Holt Street Pass, the village Letea Veche Letea Veche village, BacauThe proposed works are: The work falls under GD 766/1997 in category "CRunning time: km 1 + 100-1 + 300 - L = 1.300 km; The width of the carriageway in alignment: 5.50 m; Shoulders 2 x 0.75 m The road system consists of: foundation layer of ballast thickness of 25 cm after compaction, base layer of crushed stone to 12 cm thick layer of connection of asphalt with gravel crusher type BADPC 20 in thickness of 6 cm, wear layer of crushed gravel asphalt concrete type BAPC 16 4 cm thick.
Tenders are invited for Supply, Installation, Testing Commissioning Of Indoor And Outdoor Equipment in Connection With Isolation Upgradation Of Electronic Interlocking At Biyavra Rajgarh And Shajapur Station Including Alterations In Existing Electronic Interlocking, Testing Of Wired Circuits Etc In GUN- MKC Section Alongwith Installation Testing Commissioning Of BAPC In Guna - Maksi Section Of Bhopal Division in West Central Railway.
Tenders are invited for The Scope Of Work Is To Supply, Installation, Testing Commissioning Of Indoor And Outdoor Equipment In Connection With Isolation Upgradation Of Electronic Interlocking At Biyavra Rajgarh And Shajapur Station Including Alterations In Existing Electronic Interlocking, Testing Of Wired Circuits Etc In GUN- MKC Section Alongwith Installation Testing Commissioning Of BAPC In Guna - Maksi Section Of Bhopal Division In West Central Railway.
Contract award: "bapc asphalt 16-2 755 to the destination for the execution of the investment objective carpet dj 659 pitesti- bradu- suseni, km 13 + 000 to 14 + 900; 18 + 900-19 + 650, l = 2.65 km to suseni "
Contract award: purchase asphalt mixture bapc 4:15 p.m.
Tenders are invited for Asphalt Mixture Bapc 16-2755 to the Destination for the Execution of the Investment Objective Carpet Dj-Bradu Suseni 659 Pitesti, Km 13 000-14 900; 18 900-19 650, L = 2.65 Km From Suseni