critical path method

[′krid·ə·kəl ′path ‚meth·əd]
(systems engineering)
A systematic procedure for detailed project planning and control. Abbreviated CPM.

Critical path method

(CPM)
A construction scheduling device that diagrams the interrelationships between activities and identifies the critical path that optimizes the sequence of operations to minimize the construction period.

critical path method, CPM

A system of project planning, scheduling, and control which combines all relevant information into a single master plan, permitting the establishment of the optimum sequence and duration of operations; the interrelation of all the efforts required to complete a construction project are shown; an indication is given of the efforts which are critical to timely completion of the project.
References in periodicals archive ?
Established in 1968, Buric provides construction planning and critical path method scheduling; construction claims resolution, including forensic investigation, demonstrative graphics and expert witness capability; surety contract management; BIM process controls; and project management and control.
Established in 1968, Buric provides building information modeling; construction planning and critical path method scheduling; construction claims resolution, including forensic investigation, demonstrative graphics and expert witness capability; surety contract management; building diagnostics and rehabilitation; project management and control; and architectural and engineering design services.
His skills encompass building repair methodology, cost estimating, critical path method (CPM) scheduling, and expert witness testimony.