edge joint


Also found in: Dictionary.

edge joint

[′ej ‚jȯint]
(metallurgy)
A joint between the edges of welded members which are essentially parallel to each other.

edge joint

edge joint, 2 (welded)
1. A joint formed between two veneers or laminations, in the direction of the grain.
2. A joint formed between two boards or plates which are side-by-side.
References in periodicals archive ?
Depending on the destination of innovative product it can choose the type of joint (edge joint or trapezoidal finger joint).
1.3 / 8.0 cm, Sealed, Screwed 5.520 m 2 leveling compound 5 mm, Close 5 470 m edge joints with permanently elastic seal, 5 520 m 2 parquet protection with tetra-pack.
Road construction: - demolishing or milling pavement 4000 m2- transport and disposal of expansive asphalt 1200 t- removal and transport 1800 m3 gravel mixtures foundation 2100 m3 plan- ning 4000 m2 edge joints 1100 m supporting layers 990 t-laying layers 310 twerkleitungen: - grave excavation and transport 1200 m3 - gravel mixtures 1400 m3 plastic pipes provide 400 m plastic pipes lay 1300 m candelabrum foundations 8 st
5 mm, 1 m 2 , - cleaning asphalt surface, 8 400 m 2 , - grinding asphalt surface, 100 m 2 , - pu thin coating 0.5 mm, 8 400 m 2 , - allowance for regrooving and chamfering, 3 520 m, - edge joints with grouting, 425 m, - joints to other components, 3 750 m, - floor dividing rails 1 m, - building joints 1 m, - corners building joints 1 pc, - sheet steel strip 1 m, - grouting joints 1 m.
Npk chapter: 111, 113, 117, 211, 221, 222, 223 and 237.- build-out length: 623 m milling road 6,000 m2 cast iron grates / ks / slide 90 full renovation drainage pipes 130 m edge joints 620 m - covering work: ac f 22: 1~800 t / ac t 22 s: 1~500 t / ac 8 s: 450 t
Fuselage mass main cubes: excavation fixed: 1~800 m3 edge joints: 650 m gravel mixture loose: 1~300 m3 concrete cem kg / m3 200 lots: 200 m3 canopy planks with lock: 1~200 m2 covering: 425 t
provide and install 14,0 lfdm strip with lamella blocks as predetermined breaking point and install 390.0 m 2 apply wood plaster surface protection made of hard wax oil over several areas as final treatment 120.0 lfdm movement joints and edge joints fill with suitable materials, eg.
Kieskoffer 700 m3 planie 3~000 m2 edge joints 450 m covering layers 350 t covering layers 100 t construction work: grave excavation 750 m3 gravel spraying 1~350 m2 block of pipe: gravel sand for pipe covering 100 m3 gravel filling 500 m3 aid for laying: water pipes 220 m electricity 1 ~000 m