feed pipe


Also found in: Dictionary.

feed pipe

[′fēd ‚pīp]
(mechanical engineering)
The pipe which conducts water to a boiler drum.
References in periodicals archive ?
Limited tenders are invited for bearing housing and feed pipe support pl
Tenders are invited for Procurement of transition chute and feeder outlet gate center feed pipe
Supply of transition chute of centre feed pipe of xrp-1003 bowl mills of stage-iv
Tenders are invited for Removal of choked wet coal from chute pipe,centre feed pipe, rc feeder and opening closing of hot air gate in case of manual opening/closing for 3units (unit no.
Contract awarded for 1898n01-double braided hose pipe of length 10 meters, nominal bore of 25 mm to with stand pneumatic pressure of not less than 20 kgs/cm.sq with both ends fitment of feed pipe (fp)palm ends suitable for indian
Contract awarded for 37157190-air brake hose coupling ( complete ) for feed pipe to rdso drg no.wd-81027-s-01 alt.11 and rdso spec.no.02-abr-02 appendix ~f~ with amd no.1 of feb~ 2007 and amndt no.4 of sept.2016.
Contract awarded for 1898-a set of double braided hose pipe of length 26 mtrs, nominal bore 25 mm,working capacity of pipe not less than 20 kg/cm.sq with both end feed pipe (fp) palm ends suitable for indian railway coach end
Unit I - Mills 1A & 1B - Dismantling and lowering of MDVs, MPOs, Mill outlet Elbows and classifier Blades, patch welding in wornout portion and dismantling of centre coal feed pipe type I & II, venturi assembly and inner cone, re-fixing new/rectified centre coal feed pipes type I & II classifier assembly, rectification of venturi assembly and inner cone during annual overhaul 2018-19.
Unit-I Mills 1E & 1F- Dismantling and lowering of MDVs, MPOs, Mill outlet Elbows and classifier Blades, patch welding in wornout portion and dismantling of centre coal feed pipe type I & II, venturi assembly and inner cone, re-fixing new/rectified released & centre coal feed pipes type I & II classifier assembly rectification of venturi assembly and inner cone during annual overhaul 2018-19.
Unit I - Mills 1C & 1D - Dismantling and lowering of MDVs, MPOs, Mill outlet Elbows and classifier Blades, patch welding in wornout portion and dismantling of centre coal feed pipe type I & II, venturi assembly and inner cone, re-fixing new/rectified released & centre coal feed pipes type I & II classifier assembly, rectification of venturi assembly and inner cone during annual overhaul 2018-19.