Functional performance test


Also found in: Acronyms.

Functional performance test

A range of checks and tests carried out to determine whether all components, subsystems, systems, and interfaces between systems function in accordance with the contract documents. In this context, function includes all modes and sequences of control operation, all interlocks, conditional control responses, and all specified responses during design day and emergency conditions. Functional tests are performed after construction checklists have been completed.
References in periodicals archive ?
To familiarize themselves with the experimental protocol, the participants then performed three trials each of the 4 functional performance tests.
The results of this study didn't show any significant differences between groups in pretest for all functional performance tests.
The inclusion criteria of studies were as follows: (1) at least one lower extremity/knee functional performance test used as an outcome measurement of the article and/or patient reported outcomes, (2) subjects who were post-ACL reconstruction, (3) studies which were either randomised control trial (RCT), cross-sectional, or cohort designs, and (4) studies published in English between April 2004 and April 2014.
These methods included the one-leg hope for distance; this is a commonly used functional performance test of both strength and confidence in the tested leg; it correlates positively with muscle strength and power [7, 47].
All participants were required to perform one functional performance test (e.
However, both the agility and speed functional performance tests returned to baseline levels much sooner than vertical jump.
Then the subjects were assessed for weight discrimination ability and functional performance test before and after ice massage.
Functional performance tests (dynamic full weight bearing tests) are useful predictors of lower extremity performance [12].
Although the middle-aged subjects were slower than the younger subjects in all the timed functional performance tests, the differences were not statistically different (Table 1).
The committee will also maintain functional performance tests used by DDC manufacturers and commissioning agents to verify that sequences have been properly programmed.
Suffice it to say that the CxA must perform functional performance tests on every control loop in the project, which encompasses all of a building's major systems and equipment, including boilers, chillers, air handlers, cooling towers, pressurization systems, and so forth.
Perform functional performance tests to verify that all system components operate in an integrated manner and produce the necessary results to satisfy the OPR document.

Full browser ?