Initial Operational Test and Evaluation

Initial Operational Test and Evaluation

(testing)
(IOT&E) The first phase of operational test and evaluation conducted on pre-protectional items, prototypes, or pilot production items and normally completed prior to the first major production decision. Conducted to provide a valid estimate of expected system operational effectiveness and suitability.
References in periodicals archive ?
Right) A 2/1 AD Soldier stands before a Warfighter Information Network-Tactical Increment 2 Point of Presence on May 17, 2012 during the WIN-T Increment 2 Initial Operational Test and Evaluation at White Sands Missile Range, N.
Moreover, the DoD version of the V, as depicted in Figure 3, does not connect the early test activities to the initial operational test and evaluation (IOT&E) or interoperability testing.
The F/A-22 team successfully met the challenge of safely completing the accelerated buildup of missile separations and guided missile shots to meet the Initial Operational Test and Evaluation schedule, the council said.
AV delivered all LRIP hardware in early November and completed development testing for an initial operational test and evaluation scheduled in early 2006.
WIN-T Increment 1a systems participated in an Initial Operational Test and Evaluation from Oct.
The initial operational test and evaluation of the modified BSM was successfully conducted in late 2004, with the system determined by DOT & E to be operationally effective and potentially suitable.
The continuation of this development and testing process will eventually lead to a NATO initial operational test and evaluation program in 2003.
Army Operational Test Command during the WIN-T Increment 1a Initial Operational Test and Evaluation event to be conducted in October 2008.
Traditional guidelines call for remaining in an LRIP status and recommend limiting quantities to 10 percent of the planned production buy until completion of initial operational test and evaluation (IOT & E).
The Palmdale plant recently took on an additional task of modifying early-model F/A-22 aircraft slated for initial operational test and evaluation work.
The new ground station is expected to begin assuming DSP's daily duties in the fall once AFOTEC reports its findings from the test -- referred to as Initial Operational Test and Evaluation (IOT&E).
The Joint Network Node-Network participated in an Initial Operational Test and Evaluation from May 19 to June 27, 2006 at the National Training Center, Fort Irwin, Calif.