LIN FT


Also found in: Dictionary.
Related to LIN FT: Lineal foot

LIN FT

On drawings, abbr. for “linear foot.”
References in periodicals archive ?
Tenders are invited for The major items of work are approximately: 105,187 Cu Yd Common Excavation, 33,200 Ton Aggregate Base Class 5M, 4,100 Ton Shoulder Base Class 5M, 14,700 Ton Bituminous Mixture, 2,566 Lin Ft RC Pipe Culvert, Traffic Control, Seeding, Pavement Stripping.
Tenders are invited for 1 LS Mobilization; 430 LF remove pipe culverts; 50 LF sawing bit pavement (full depth); 1,620 SY geotextile fabric type vi; 2,291 ton aggregate surfacing class 5; 68 hour motor grader; 68 hour 8 ton steel-wheeled roller; 190 gallon water; 4,594 ton aggregate base class 5; 452 CY aggregate base (cv) class 5(p); 51,567 SY full depth reclamation; 2,950 gallon bituminous material for tack coat; 2,414 gallon bituminous material for shoulder tack; 11,489 TON type sp 9.5 wearing course mix (2,c); 963 CY granular backfill (cv)(p); 1,959 CY structure excavation class e(p); 304 CY granular bedding (cv)(p); 40 LF 30" rc pipe culvert class III; 2 ea 30" rc pipe apron; 17" span cas pipe-arch culvert, lin ft 82.
quantities are as follows: 603 TON Aggregate Surfacing Class 2 Modified 7 TON Aggregate Surfacing Class 7B 8,050 Ton Aggregate Shouldering Class 1 Modified 5,613 SY Mill Bituminous Surface 18,020 GAL Bituminous Material for Tack Coat 30,443 TON Type SP 12.5 Wearing Course Mixture (2, B) 4,790 TON Type SP 12.5 Wearing Course Mixture (2, C) 9,390 LIN FT Temporary Lane Marking 270 LIN FT 24?