diamond crossing

(redirected from Level junction)
Also found in: Wikipedia.

diamond crossing

[′dī·mənd ‚krȯs·iŋ]
(civil engineering)
An oblique railroad crossing that forms a diamond shape between the tracks.
Mentioned in ?
References in periodicals archive ?
8 veszprm southern bypass highway 44 + 600 - 52 + 100 km with 2x2 lanes, With physical separation, Current pavement widening, One-step implementation, Continuous 7.5km - level nodes 6 pcs - special level junction (bridges) 3 (budapest road, Almdi road, Fredi road) - 7217 j.
The project also includes the construction of a flyover on Latifa Bint Hamdan Street intersecting the First Al Khail Road, while a signalised ground level junction will also be developed underneath the flyover, along with the improvement of the intersection of Umm Al Sheef Street with Al Wasl Street.
Contract notice: Improvement - repair of peo 65 Thessaloniki, From a level junction with e.2 Thessaloniki - edessa (diavata), To the boundaries of n.
The project's main interchange, Al Jahaniya Interchange, is a four level junction that consists of six flyovers and bridges, an underpass, two tunnels and multiple utility culverts.
a special level junction planned for budapest within the framework of the development of the main road divisional highway into a major highway and the 82nd.
Tenders are invited for Making interconnection to existing air valve on 1200mm dia to existing 400mm dia manikonda line at shaikpet high level junction and interconnection of rws bulk connection at sabitha nagar, under omansagar section,sub-divison no.ii, o&m division no.
Tenders are invited for Replacement of Drainage line from Bolar Level Junction in MCC limits (100crore special grant 2nd and 3rd stage)
The Highways Agency is planning to spend millions of pounds on a split- level junction to improve safety.
Tenders are invited for Supporting Wall At 2Nd Dip/4Th Level Junction And 2Nd Dip/5Th Level Junction Of Dishergarh Seam Of Ningha Colliery
Tenders are invited for Supporting wall at 2nd dip-4th level junction and 2nd dip-5th level junction of dishergarh seam of ningha colliery.
The central reservation gap has been closed, preventing drivers turning right across the westbound A45, and the crossing replaced with a split- level junction at Maxstoke.