PRV station

pressure regulating valve station, PRV station

An installation of multiple pressureregulating valves in a single zone of a water supply system in a building.
References in periodicals archive ?
Tenders are invited for Providing forklift shed, aluminium enclosures in bag1and2, prv station, substation-c to meet oandm requirement at various locations of p-3a.
As a result, the city eliminated another PRV station and replaced it with a bypass.
the project also include all improvements necessary to provide a safe, reliable, and fully functional booster pump and prv station (s) system with a complete restoration of existing sites to current or better condition.
0 million gallon steel water storage tank, concrete ring wall foundation and appurtenances, and upgrades to the bentley brook prv station.
Update the SCADA system for two (2) existing PRV stations; add for two (2) existing stations, add for one (1) new PRV station, update for the existing High Service Pump Station and the Tank using a modular cellular, radio, wired or Ethernet RTU with built in Human Machine Interface (HMI).
Phase 3: Install 2,037 LF of water main with appurtenances and PRV station.
Tenders are invited for construction services for rebuilding the 200 to 125 steam distribution system at Fairview PRV station (the Project ).
Project Description :This project includes land purchase and construction of an above-ground PRV station at the pressure zone 5E/6E boundary near Loop 303 on Lake Pleasant Parkway.
Justification:This transmission main will connect the future Avra Valley Augmentation B to A PRV station at Drexel Road and Santa Cruz Lane north to the existing 12-inch A-Zone transmission main at approximately Nebraska Road and Santa Cruz Lane.
Justification:This transmission main will convey water to the B-Zone to A-Zone PRV station at Drexel Road and Calle Santa Cruz Lane, B-Zone at Bilby Road and Park Avenue and continue to the proposed Bilby Reservoir (W570).
It is the goal of the City of Santa Fe to update the SCADA system for 17 existing PRV stations using a modular cellular RTU with built in Human Machine Interface (HMI).
The following asset assessments are anticipated: o Bellamy Reservoir o Madbury Surface Water Treatment Facility (built in 2011) o 8 Wells o 2 Booster Stations o 2 PRV Stations o 4 Distribution Storage Tanks o 189 miles of pipe o 972 Public Fire Hydrants o 2,840 Valves o 8,203 Meters/Customers o Unique components (interconnections, river crossings, etc.