RPL


Also found in: Dictionary, Thesaurus, Medical, Legal, Financial, Acronyms, Wikipedia.

RPL

Reverse Polish LISP. Language used by HP-28 and HP-48 calculators.
This article is provided by FOLDOC - Free Online Dictionary of Computing (foldoc.org)
References in periodicals archive ?
Throughput of RPL is persistently lower than M-RPL because the single paths used by RPL get congested.
RPL Mergers is a specialist technology M/A firm formed in 2004 to advise owner-operators on exits, disposals and earn-outs.
Overview of DODAG Construction in RPL. RPL is a distance vector routing protocol that builds a DODAG in addition to a set of features to bound the control traffic, support local (and slow) repair, and so on.
The literature review on ART and RPL revealed that ART is not very efficient for having a live birth compared to expectant management.
In addition to existing 15 trades of the RPL program, 2 more trades have also been added in the 2nd phase.
The risk of venous thrombosis is increased 7 times in heterozygote and 80 times in homozygote carriers.9 Recently several studies have suggested that FVL mutation, through the production of micro thrombosis on placental bed blood vessels, cause low placental perfusion, placental infarction, and is strongly associated with RPL and maternal and foetal complications.10 It causes 2-6 fold increase in the risk of preeclamsia in FVL carriers.
He said: "Central RPL is a business I am familiar with and was an obvious choice for our first acquisition.
Kolte and her associates, moderate to severe depression was identified in 8.6% and high stress levels in 41.2% of 301 women with three or more pregnancy losses before 12 weeks gestation, compared with rates of 2.2% and 23.2%, respectively, among 1,813 women without RPL (Hum.
NTA's pilot project over the last few years, initiating RPL as a method of achieving national standards, was very successful.
RIL, prior to the merger, allegedly short- sold 4.1- per cent stake in RPL valued at ` 4,023 crore to prevent a slump in the stock.
Bedfords group managing director Steff Pfadenhauer said: "The fantastic reputation, dedication of the management team and drivers, location and operations capabilities of RPL Transport are just some of the reasons we took the decision to pursue this acquisition.
Cameron (2012) developed this framework by combining concepts from work undertaken by Cameron and Miller (2004) on models of RPL, and in particular the concepts of RPL as process and RPL as product.