(44) Transneft and the China National Petroleum Corporation (CNPC) are now in the final stages of building a parallel pipeline from
Skovorodino to Daqing that would expand the system capacity to six hundred thousand barrels per day; it is slated to enter service in 2018.
Bashlykov, and the chief of the
Skovorodino station A.I.
(55) To make this possible, Transneft expands the ESPO-1 (to
Skovorodino) and the ESPO-2 (to Kozmino) ahead of schedule: the two phases will reach their projected capacity of 80 Mt/y and 50 Mt/y, respectively, by 2020 instead of originally planned 2030.
ESPO is carrying crude oil to Daqing in China from Russia's
Skovorodino. But a further expansion of Vankor and other near-by fields will not be completed before 2019.
The first phases of the pipeline have raised its capacity to 30m t/y (600,000 b/d) from the town of Taishet to
Skovorodino. From there, a spur line runs to the Chinese border, where half of the oil - 300,000 b/d - is moving to Daqing.
Transneft said on its web site that Rosneft would export an additional 600,000 tonnes (12,000 barrels per day) to China via the East Siberia-Pacific Ocean (ESPO) pipeline spur from
Skovorodino near the border to Mohe in northern China.
Among the routes for these oil supplies the parties will consider the one through the Russian city of
Skovorodino, as well as another through Kazakhstan, the Trend reported.
Moscow, Safar 12, 1434, Dec 25, 2012, SPA -- Russia's 4,740-kilometre-long East Asia oil pipeline went officially into service on Tuesday, with the completion of an about 2,000-kilometre section between the Siberian city of
Skovorodino and the Pacific port of Kosmino, Russian media reported.
"If they (EU nations) want to hold a normal, proper conversation, they should change their approach to such a dialogue." The pipe's first leg had until now pumped 30 million tonnes (220 million barrels) of oil per year from Eastern Siberia to the Chinese border town of
Skovorodino. One half of that oil went along an existing pipeline to the Chinese city of Taishet while the other was transported by tanker car to Kozmino.
It is located in Amur region, approximately 50km north of the Trans-Siberian railway and 100km from
Skovorodino railway station.
Rusya'nin
Skovorodino sehrine kadarki kismi 26 Eylul 2010'da isletime acilan hattin, Cin'in Daking sehrine kadar olan 2400 km'lik bolumunun 2015'e kadar tamamlanmasi hedeflenmektedir.