St. Gallen

(redirected from St. Fiden)

St. Gallen

 

(Sankt Gallen), a city in northeastern Switzerland, near the southern shore of Lake Constance. Capital of Sankt Gallen Canton. Population, 81,700 (1973). The city has textile, garment, chemical, food, printing, and metalworking industries. It also has a higher school of economics and industrial, historical, and ethnographic museums.

St. Gallen grew up around an abbey, established during the seventh and eighth centuries; the abbey’s foundations, laid circa 820, have been preserved. From the ninth through the eleventh century, St. Gallen was a cultural and artistic center. It has the Romanesque St. Magnus Church (eleventh century) and a baroque abbey church (1755–67) with a library (1758–67), both by architect P. Thum and others.

REFERENCE

Boerlin, P. H. Die Stiftskirche St. Gallen. Bern [1964].
References in periodicals archive ?
Gallen winkeln, kreuzbleiche, st. Fiden and neudorf.the chief traffic officer assists the ofrou, the support to the project owner and the authors of the project as part of the processing of the uplans project saint-gall west - saint-gall est, of the realization phase commissioning.a body consisting of representatives of the ofrou, the canton of saint-gall, the city of saint-gall, the police, the operators of public transport, the territorial unit vi and the directorate-general for works and / or the chief construction officer will be institutionalized for the project.
gallen winkeln, kreuzbleiche, st. fiden and neudorf after approximately 30 years of operation.
gallen winkeln, kreuzbleiche, st. fiden und neudorf nach rund 30 jahren betriebszeit instand zu setzen.Die submission beinhaltet die vorarbeiten uplans st.
Between terminals St. Fiden and Neudorf the hard shoulder to be converted permanently uses a third lane (Project 2) in both directions.
Gallen planner BSA for the total renewal of the operating and safety equipment in the tunnel Rosenberg, Shor, Stephan Horn, St. Fiden and open lines for the SIA-phase 32 - 53rd
Contract awarded for N01 / 54 UPlaNS SG West - SG SEA Planner for complete reconstruction of the operating and safety equipment in tunnels Rosenberg, Schoren, Stephanshorn St. Fiden and the open section for phases 32-53 SIA .
Tenders are invited for Total renewal of the operating and safety equipment in the tunnel Rosenberg, Shors, Stephan Horn, St. Fiden and open lines for the SIA-phase 32 - 53rd