wind farm

(redirected from Windpark)
Also found in: Dictionary, Thesaurus.

wind farm

a large group of wind-driven generators for electricity supply

Wind farm

A vast tract of land covered with wind-powered turbines that are used to drive generators that produce electricity.
Mentioned in ?
References in periodicals archive ?
Added Tijmen Keesmaat, Managing Director of Windpark Krammer: "This is a great achievement.
Here's how Windpark Solutions America breaks down the mechanics of creating electricity with wind turbines:
In addition, GE and Germania Windpark also have signed a full service agreement (FSA) covering the new wind turbines, which will provide wind turbine owners with total support for all of their planned and unplanned maintenance and operational needs.
announced that its wholly-owned investment banking subsidiary, FTI Capital Advisors, LLC (FTICA), served as the exclusive financial advisor to Noble Environmental Power and MUFG Americas Holdings Corporation subsidiary Bankers Commercial Corporation (MUFG) on the completed sale of Noble Great Plains Windpark (NGPW) to Geronimo Renewable Infrastructure Partners (Geronimo Energy).
Combined property damage and business interruption all risks insurance for the operational phase of the offshore wind farm Trianel Windpark Borkum, consisting of 40 offshore wind turbines including foundations and inner-array cables, and a separate similar policy for the Infrastrukturgesellschaft Windkraftwerk Trianel GmbH and Co.
Major organization : OFFSHORE WINDPARK RIFFGAT GMBH & CO.
WPD wind farm projects which include Lange Heide 2, Hofgeismar, Schlenzer, Hohenseefeld 3 and Windpark Blender succeeded in the auction.
Lange Heide 2, Hofgeismar, Schlenzer, Hohenseefeld 3 and Windpark Blender were successful in the auction are comprised in the WPD wind farm projects.
The windpark is located directly on the coast, about 60 km from Norway's second largest city, and benefits from optimal wind conditions.
Contract notice: CAR/EAR Trianel Windpark Borkum (AC) DolWin1.
The contract includes the design and supply of the export cable protection systems which connects the Borkum Riffgrund 2 offshore windfarm to the DolWin Gamma platform, and the second phase of the construction of the Trianel Windpark Borkum II and connection to the DolWin alpha platform.
According to the EWEA windmill operations and maintenance represents 30% of the cost of windpark project, and NREL (U.S.