category III operations

category III operations

With respect to the operation of aircraft, it means an ILS (instrument landing system) approach to the runway of an airport, using the Cat III ILS approach procedure issued by the national aviation regulatory authority or another appropriate agency. In Cat III operations, there is no decision height and the minimum RVR (runway visual range) is 700 ft.
Mentioned in ?
References in periodicals archive ?
Flight Operations with the B767-300F additions will include the certification for Category II and Category III operations along with qualifications for Extended-range Twin-engine Operational Performance Standards (ETOPS).
"Indra is working proactively to get GBAS GAST D approved for Category III operations. After ICAO requirements for GAST D became effective in November 2018, we are confident an approval is realistic", comments Linda Lavik.
Also, because of the dense fog, Category III operations could not be carried out from 2.17 am to 10.29 pm.
The switch to full Category III operations took place Dec.
In the future, as GLS ground stations become available worldwide, the system will be able to support Category III operations, which allow aircraft to operate in very low or near zero visibility conditions.