The excavation of material that does not require blasting, such as earth, in contrast to the excavation of solid rock.
References in periodicals archive ?
Common excavation for drainage systems and water and electricity supply pipelines, length 115 m, average depth 4.00 m, max / - 4.70 m for water and electricity pipes, length 125 m, depth average 1.40 m excavation excavations about 1~900 m3.Refection pavement, enrobs 190 to.
Increases in the unit prices for common excavation, structural steel, and portland cement raised the index in the first quarter.
Unit prices for common excavation, bituminous concrete, and reinforcing steel decreased, while unit prices for portland cement concrete, structural steel, and structural concrete increased.
Common excavation for wastewater collectors eu + ec + mains water, gas and public lighting.
Increases in the unit prices for bituminous concrete, reinforcing steel, common excavation, structural steel, and structural concrete raised the index in the second period.
Common excavation for wastewater collectors eu + ec + water pipes and public lighting.
Tenders are invited for works include amphitheater-development; stage structure, erosion control, clearing an grubbing, stripping topsoil, common excavation, dense graded base, concrete flatwork, structure, stone wall, stone steps, flagstone pavers, crushed granite, seeding, and restoration; see outside link.
Common excavation for wastewater collectors eu + ec (length 255 m, average depth 4.00 m, max 5.50 m, excavation volume approx 1800 m3).
Tenders are invited for estimated amounts of construction items are as follows: 1,586 cy of common excavation; 1,551 cy of backfill granular 2,650 t crushed aggregate base course 1,910 lf of 30" concrete curb and gutter 6,250 sf of 4" & 6" sidewalk 550 t hma pavement 425 lf of 8" watermain 850 lf of 18: & 15" sanitary sewer 750 lf of r.C.P.
Tenders are invited for work includes approx 2,250 lf of 8"-10" pvc sanitary sewer; 275 lf of 12"-15" rcp storm sewer; 3,000 lf of 6"-8" pvc water main; 12,000 sy remove bituminous/concrete pavement; 5,700 lf remove and replace concrete curb and gutter; 8,800 cy common excavation; 1,500 tn type sp 12.5 wearing course mix; 1,500 tn type sp 12.5 non-wear course mix.
Tenders are invited for work includes approx 1,100 tn shoulder base aggregate (special); 650 cy common excavation; 520 cy select granular borrow (lv); 69 sy 6" concrete driveway pavement; 5,600 tn type 12.5 wearing course mixture (2,b); 2,540 tn type sp 4.75 wearing course mixture (2,b); 32 lf of 18" rc pipe culvert; 1,034 sy mill bituminous surface; see outside link.
Tenders are invited for removing existing bridge; removing pavement surface 455 sy; common excavation 3,350 cy; disposal of special waste 90 t; common borrow 100 cy; granular borrow 1,370 cy; structural earth excavation-drainage and minor structures, below grade 50 cy; structural earth excavation-major structures 60 cy; aggregate sub-base course-gravel 2,250 cy; hot mix asphalt 12.5 mm hma surface 300 t; hot mix asphalt 9.5 mm (sidewalks, drives, incidentals) 8 t; hot mix asphalt (shimming) 19 t; hot mix asphalt 12.5 mm base 441 t; bituminous tack coat-applied 134 g; untreated aggregate surface course 5 cy.