counter batten

counter batten

A furring strip which is below, and at right angles to, the battens.
References in periodicals archive ?
03 Contract Award Notice or call off from a framework (below OJEU threshold): Work is to re-roofing 8 houses, comprising stripping existing concrete tiles, batten & counter batten, re-tile roofs, complete with remedial repairs, gutter and downpipe replacement.
External walls comprise duplex plasterboard, a lightweight steel framework, fibre glass insulation and timber counter battens.
1 300 m 2 ; substructure for wooden clothing made of metal spacers; with wood battens and counter battens approx.
6 850 m 2 application of new battens + counter battens, Approximately 6 850 m 2 applying new roof foil, Approximately 6 850 m 2 new roofing with plain tiles, Approximately deliver and install 60 m throat wasserfalz copper, Approximately deliver and install 2 000 m of snow guard, Approximately supply and install 1 000 safety roof hooks approximately 100 m temp.
The counter battens, Roof battens and the biberschwanzdoppeldeckung be renewed by means of kirchenbieber.
5 200 m 2 of demolition pressed brick, - about 5 200 m 2 deconstruction battens + counter battens, - approx.
Saddle roof new construction: - airtightness layer, self-adhesive - 635 m 2 , - roofing insulation elements pur, thickness 120 mm - 580 m 2 , - support / counter battens - 635 m 2 , - cut to ridge, throats, ridges - 220 m, - roofing beaver tail - 635 m 2 , - allowance cover work - 0395 m, - gutter titan zinc nw 333 - 108 m, - rain pipe titanium zinc dn 100 - 40 m.
Sheet metal work: The contractor is to assemble various wall constructions with vertical softwood clothing together with aluminum uk with insulation, Windproof membrane and counter battens.
Working in several sections, including weather protection, buildings in operation: dismantling work biberschwanzdeckung 800 m 2 ; dismantling sheet metal covering 965 m 2 ; dismantling roof drainage, gutters, downpipes, sheet metal; dismantling of wooden formwork 965 m 2 ; disassembly of tar cork 35 m 2 ; beaver-tail double covering with battens, counter battens, underlay 800 m 2 ; roof exit, roof window 9 st; osb boards in the eaves area 125 m 2 ; insulation and bit.
120 pieces, new roof formwork with roofing membrane, counter battens and the like for 650 m 2 , renewal of the Thermal insulation in the cold roof area approx.
47 x 18 x 18 m, approximately 250 m kvh supports 12 x 12 cm, approximately 215 m kvh-fupfetten 16 x 12 cm, approximately 325 m kvh purlins 12 x 24 cm, approximately 2 500 m kvh rafters 8 x 20 cm, approximately 80 m kvh change 8 x 20 cm or 12 x 20 cm, approximately 505 m windbreaks 14 x 3 cm, approximately 2 615 m counter battens 6 x 4 cm, approximately 2 010 m 2 underlay, approximately 2 380 m 2 thermal insulation.
Carpentry and carpentry Supply, set and erect construction timber KVH for new roof constructions and dormers as well as supplementing and retrofitting roof constructions Supply and installation of undervoltage lanes and counter battens Delivery and installation of roof formwork Delivery and installation of steel structures in the roof rack 1.