cut methods

cut methods

[′kət ‚meth·əds]
(systems engineering)
Methods of solving integer programming problems that employ cut constraints derived from the original problem.
References in periodicals archive ?
Tenders are invited for the work includes, but is not limited to the following: extension of the existing finished water transmission main via trenchless and open cut methods of pipe installation; valves, blow-offs and appurtenances; pavement removal and replacement; and traffic control and protection.
The association has been marred by doping scandals, with many admitting that it is the coaches from east Europe who are helping Indian athletes take up short- cut methods.
According to the company, the speed of a wheel trencher allows it to replace anywhere from 4 to 10 backhoes for open cut methods.
As we stand, the deposit has been defined to feasibility study standards and can be mined by low cost open cut methods.
This line would be constructed by trenchless and open cut methods and includes a railroad and highway (Highway 303) utility crossings.
The permitting process is underway, and the joint venture expects to begin mining this year, using open pit - open cut methods.
Installation of storm sewer is by open cut methods.
Tenders are invited for Construction of approx 330 LF of 8" waterline by open cut methods, 930 LF of 8" sanitary sewer, abandonment of 495 LF of 8" sanitary sewer, removal of 163 LF of 8" sanitary sewer, including all valves, fittings, appurtenances, services, manholes, demolition, appurtenances, SWPPP, bypass pumping, site restoration, and all other related items.
Reduction in utility outages common with open cut methods.
1,200 LF of 12" waterline by open cut methods, 313 LF of 12" waterline by trenchless construction method, 145 LF of 12" waterline by trenchless construction with 24" steel casing, and all related items of work.
The Work includes: This project consists of rehabilitation of existing sanitary sewer facilities in approximately 33 locations generally located in the south-central portion of Las Vegas valley, including: repair and line 63 existing manholes, line 9 existing manholes, removal and replacement of 34 manholes, of which 19 are lined, installation of 11 manholes, 8 of which are lined, removal and replacement of approximately 6340 ft of sewer pipe in sizes of 8 inch through 21 inch diameter using open cut methods, installation of approximately 940 ft of sewer pipe in sizes of 8 through 15 inch diameter using open cut methods, installation of 125 ft of 8 and 12 inch sewer pipe using jack and bore methods, and lining of approximately 1020 ft of 12 and 15 inch diameter existing sewer pipe.