inspection chamber

(redirected from inspection chambers)
Also found in: Dictionary.

manhole

manhole
A covered opening in a street which provides access for cleaning and repairing of a sewer beneath, or for repairing a conduit for electric underground piping or electric cables.
References in periodicals archive ?
Firstly recognise where drains run around our home, particularly the inspection chambers and rodding eyes.
An infrared welding system using special-purpose infrared emitters from Heraeus Noblelight has improved the quality of an inspection chamber assembly production process, and eliminated environmental problems associated with the hot melt adhesive technique formerly used.
According to Murad, the project comprises of extending 1,228km long main lines, 792m long sub-lines, constructing 151 inspection chambers and connecting 108 houses to the sewerage network.
Construction on the Sanad sewerage network project in Bahrain, which involves laying of 827-m-long main pipe connections, and building of 100 inspection chambers, is progressing well, said senior officials.
According to Murad, the project comprises of extending 750m long main lines, 930m long sub-lines, constructing one lifting station and 72 inspection chambers for both the main and sub-connections.
According to Nazha Abu Hindi, director of the Sanitary Engineering Planning & Projects, the project comprises of extending 645-metre long main connections, 535-metre long sub-connections, constructing 71 inspection chambers and connecting 60 houses to the network in Block 748.
12km of main connections and construction of 36 inspection chambers besides 56 storm water collection points and 12 storm water collection tanks, stated Asma Murad, the Sanitary Engineering assistant undersecretary at the Ministry of Works, Municipalities Affairs & Urban Planning.
25km long main connections, constructing 21 inspection chambers, 189 drains and 31 storm water collection tanks to serve residents of Muharraq and the Capital Governorate.
Tenders are invited for Removal Of Dry Leaves And Waste Materials, Grass Cutting And Cleaning Of Septic Tanks Inspection Chambers Drain And Disposal Of The Same For 24 Months At Rnc Ccl Ranchi
The project comprises extending 3-km long main connections, constructing 29 inspection chambers, 49 storm water collection points and 11 storm water collection tanks to serve residents of the Northern, Southern and the Capital Governorates.
Tenders are invited for Removal Of Dry Leaves And Waste Materials Grass Cutting And Cleaning Of Septic Tanks Inspection Chambers Drain And Disposal Of The Same For 24 Months At Rnc Ccl Ranchi
3km long sub-connections and constructing 360 inspection chambers.