measuring chain

measuring chain

1. See chain.
References in periodicals archive ?
2) one-time planning / repair measures: The following known one-off (repair) services are to be performed during the operating period: - inspection of the over and underwater steel structure, - detailed weld seam inspection on the mast, - replacement of the engine control, - renewal of the webcams, - renewal of the corrosion protection coating in the area of the measuring chain, - participation in the decision-making process for the future of the platform, Including preparation of a concept study on possible demolition concepts of the platform, - option 1 - award of a study to calculate the service life extension.
Along the same lines, a session titled, "From Sensor to Cloud: Practical Considerations for Signal Conditioning Over Data Acquisition to Cloud Solutions." goes through all the steps of a measuring chain from sensor to cloud, discusses potential pitfalls, and show some practical examples.
A second additional measuring chain is eliminated by the analogue output.
Measuring chain sketch for registration of drawing force on multi-stage tools in given in Fig.
This measuring chain and simulation results of losses in any actual drive stage conclude the charts of the absolute efficiency uncertainty in Figure 3 and Figure 5.
The available product brochures from bmcm are categorized by the links of the measuring chain: sensors, measuring amplifiers, data acquisition systems, and measurement software.
This allows the thermometer to be calibrated along with the entire measuring chain - without disconnecting the electrical connections.
Despite the mentioned complications with AE signal sensing, we have managed to find optimal setting of the measuring chain and to process some records of high-quality and damaged radial bearings.
1 shows the areas (in red) where random errors may occur in the measuring chain. Control and management of these variables require a good understanding of the underlying factors.
Thus the input force ("on handle" or near the force generator) has been measured by tensometric force gauge, attached to the portable computerised multichannel measuring chain Spider Mobil (HBM, Germany), and synchronically - the kinematic parameters of movement of the loading plates, exciter and the stabilizer roller have been measured by means of 3D motion Capture system (Qualisys, Sweden).
Lot 1 geothermal probe system drilling of 39 holes 99 m deep for 37 pe double-u geothermal probes and 2 temperature measuring points with measuring chain and data logger.