PERT

(redirected from perter)
Also found in: Dictionary, Thesaurus, Medical, Legal.
Related to perter: Peter Pan, Peter the Great, porter

PERT

[pərt]
(systems engineering)
A management control tool for defining, integrating, and interrelating what must be done to accomplish a desired objective on time; a computer is used to compare current progress against planned objectives and give management the information needed for planning and decision making. Derived from program evaluation and review technique.

PERT

An acronym for program evaluation and review technique; a planning, scheduling, and control procedure based upon the use of time-oriented networks which reflect the interrelationships and dependencies among the project tasks (activities). The major objectives of PERT are to give management improved ability to develop a project plan and to properly allocate resources within overall program time and cost limitations, to control the time and cost performance of the project, and to replan when significant departures from budget occur.

The basic requirements of PERT, in its time or schedule form of application, are:

1. All individual tasks required to complete a given program must be visualized in a clear enough manner to be put down in a network composed of events and activities. An event denotes a specified program accomplishment at a particular instant in time. An activity represents the time and resources that are necessary to progress from one event to the next.

2. Events and activities must be sequenced on the network under a logical set of ground rules.

3. Time estimates can be made for each activity of the network on a three-way basis. Optimistic (minimum), most likely (modal), and pessimistic (maximum) performance time figures are estimated by the person or persons most familiar with the activity involved. The three-time estimates are used as a measure of uncertainty of the eventual activity duration.

4. Finally, critical path and slack times are computed. The critical path is that sequence of activities and events on the network that will require the greatest expected time to accomplish. Slack time is the difference between the earliest time that an activity may start (or finish) and its latest allowable start (or finish) time, as required to complete the project on schedule.

5. The difference between the pessimistic (b) and optimistic (a) activity performance times is used to compute the standard deviation () of the hypothetical distribution of activity performance times [= (b - a)/6]. The PERT procedure employs these expected times and standard deviations (σ2 is called variance) to compute the probability that an event will be on schedule, that is, will occur on or before its scheduled occurrence time.

In the actual utilization of PERT, review and action by responsible managers is required, generally on a biweekly basis, concentrating on important critical path activities. A major advantage of PERT is the kind of planning required to create an initial network. Network development and critical path analysis reveal interdependencies and problem areas before the program begins that are often not obvious or well defined by conventional planning methods.

program evaluation and review technique (PERT)

A management control technique applied to building construction; determines what must be done to complete construction by a given date. Current construction progress is monitored on a computer and compared with the planned schedule so as to provide a management tool for further planning and decision making.

PERT

1. Acronym for “project evaluation and review technique.”

PERT

References in periodicals archive ?
Selections include Novy's "Introduction"; Barbara Hodgdon's "Making it New: Katie Mitchell Refashions Shakespeare-History"; Penny Gay's "Recent Australian Shrews: The 'Larrikin Element'"; Patricia Lennox's "A Girl's Got to Eat: Christine Edzard's Film of As You Like It"; Marianne Novy's "Saving Desdemona and/or Ourselves: Plays by Ann-Marie MacDonald and Paula Vogel"; Perter Erickson's "Rita Dove's Shakespeares"; Francesca T.
Senior manager for new business department, Perter Villanueva, said the "one-stop shop" solutions hub serves both the business and academic fields of the country.
Bourne Displays And Shop Fittings said the trend was towards smaller, perter breasts with larger nipples.
THESE will shorten your bottom and make it appear perter. But stay well clear of these if you have a naturally curvy behind as they will exaggerate it and create an unflattering view.
Aussie Shane McNally, in caretaker charge for today's home clash against Widnes, has applied for the WAKEFIELD job permanently after Perter Roe's sacking.
Do these moves every day for two weeks and you'll be rewarded with a trimmer waist, flatter tum, firmer thighs, perter bottom and tighter upper arms.
Her bottom's a little perter, the legs more slender and the waist pinched enough to create the illusion of a perfect hour-glass figure.
Mittheilungen aus Justus Perters' Gregraphischer Anstalt uber wichtige neue Erforschungen auf dem Gesammtbebiete der Geographie, Gotha: Justus Perthes, 15(9), 323-330.