phased construction

phased construction

Construction in which the stages of design and construction overlap, thereby shortening the time necessary to complete the project.
References in periodicals archive ?
Tenders are invited for work include clearing and grubbing; phased traffic control; temporary traffic diversion maintenance; sediment and erosion control; work zone dewatering; demolition and disposal of existing bridge; weathered rock removal (culvert and channel excavation); phased construction of reinforced concrete box culvert and wingwalls; structural backfilling; riprap placement; temporary and permanent electrified fence replacement; temporary and permanent water line relocation; and guardrail construction.
Phased construction is expected to commence in 2006.
Arvida yesterday signed off its phased construction of a 210,000 square foot processing facility for Irish venture Dawn Pac at Cross Hands.
In addition, it allows an organization complete flexibility in the future to change the layout of a given floor This approach is invaluable for organizations that require phased construction due to project size and those that experience a great deal of change over time.
The loan covers 134 units in phase II and allows for phased construction of up to 100 units at a time, with additional units to be started as sales of phase II close.
The company is on schedule in the phased construction programme to rebuild affected areas and relocate production processes and machinery to other areas.
Tenders are invited for seeking to retain a engineering firm/team to provide comprehensive survey, design and phased construction document packages, and phased construction administration for repair and rehabilitation of the existing sprinkler and standpipe systems of pier 40.
The general contractor, Waco Management of Lynbrook, NY, devised a phased construction schedule which allowed access to the tenants space while maintaining security to the telephone switch.
Request for Proposal (RFP) - the Hudson River Park Trust ( Trust ), a public benefit corporation of the State of New York, is seeking to retain a engineering firm/team to provide comprehensive survey, design and phased construction document packages, and phased construction administration for repair and rehabilitation of the existing sprinkler and standpipe systems of Pier 40 within the Hudson River Park ( Park ) at West Houston Street along Manhattans West Side.
Phased construction dictated that a platform be constructed as a completely independent structure capable of spanning the FDR Drive and acting as a work platform for the construction of the hospital tower above.