pile head

pile head

The upper end of a pile.
References in periodicals archive ?
Considerations for pile design include ground conditions (soil friction/end bearing capacity), pile capacity (tension/compression), crack width criteria and pile shear capacity (particularly at the pile head, where it can be subjected to high shear forces due to the raft thermal/shrinkage movements).
The test processing was controlled by the settlement of the pile top, and the load test was terminated once an inflexion point appeared on the load-settlement (Q-s) curve, or once the pile settlement exceeded 80 mm when the Q-s curve of the pile head varied gradually.
These charts enable simple estimates of maximum bending moment and pile head deflection
This work studied the influence of static load ratio and cyclic load ratio on the accumulated settlement of the pile head and the cyclic secant modulus of pile head.
8] got formula for reliability of foundation pile under ultimate limit state and serviceability limit state and studied the influence of randomness of allowable settlement of pile head on reliability analysis result under serviceability limit state.
i]) denotes a displacement of a pile head dependent on random variables [X.
c,d] represents the total load carried at the pile head, which is the summation of base and shaft resistance which in turn, is the multiplication of base and shaft areas, [A.
The displacement was applied to the pile head (Figure 6c), and the load was the output of the calculation procedure.
The invited papers discuss analysis of laterally loaded pile groups with partial pile head fixity, advances in auger grouted piles, the load displacement behavior of ACIP piles, and the selection of continuous flight auger and drilled displacement piles.
The biggest displacement of the front-row and back-row piles is at depth of 5 m below the pile head.
To this end, a model of a sand slope was established in order to study the effect of pile spacing and pile head fixity condition in one row of piles on the deformation and stress transfer behavior in the system.
Tenders are invited for Repairing F/E Of Repairing Of B/C Structural Repairing Of Stock Pile Head Drum Plate Form In Main Washing Plant At Sawang Washery.