Schematic design phase


Also found in: Dictionary, Thesaurus.

Schematic design phase

The first phase of the architect’s basic services. The architect prepares schematic design studies, consisting of drawings illustrating the scale and relationship of the projected components for approval by the owner.

schematic design phase

The first phase of the architect’s basic services. In this phase, the architect consults with the owner to ascertain the requirements of the project and prepares schematic design studies consisting of drawings and other documents illustrating the scale and relationship of the project components for approval by the owner. The architect also submits to the owner a statement of probable construction cost.
Mentioned in ?
References in periodicals archive ?
"I can't definitively say right now that we've got enough funds to get through the schematic design phase," Mr.
At the end of the Schematic Design phase, the total project cost estimates are developed by the architect and independently checked by our owner's project manager before being submitted to the MSBA.
During the Schematic Design phase of a project, rough luminaire layouts can be created using isofootcandle plots.
The ability of any system to adapt to changing usage patterns should be addressed during the schematic design phase, along with the ability of the system to serve immediate needs (Fig.
The Schematic Design phase usually takes about three months, depending on the scope of the project.
For each, the completed schematic design phase sets the stage for design development.
The project manager also helped during the schematic design phase of the project.
Generally, architects use a fixed fee for the phase of the work that they have the most control over, such as the preparation of working drawings, and use hourly rates for phases that are less predictable, like the early schematic design phase. Reimbursable expenses, such as long-distance telephone calls, printing, and photography, are often billed at 1.15 to 1.25 (or more) times the invoice cost.
Tenders are invited for services of feasibility study through the schematic design phase. the resulting contract between the district and the designer may be amended to include continued designer services through design development, construction documents, bid and award, construction and final closeout of the potential project.
WORCESTER -- The Massachusetts School Building Authority board of directors voted Wednesday to move the Nelson Place School building project into the schematic design phase.
While Cranleigh Abu Dhabi is still in the schematic design phase, it will be built over seven hectares of land, with a capacity to accommodate more than 1,600 students between the ages of three and 18.
I'm frequently pulled into projects that are already through the schematic design phase and heading fast to design development review.