unclassified excavation

unclassified excavation

An excavation in which there is a single unit price for removal, regardless of the proportion of common excavation and rock excavation (compare with classified excavation).
Mentioned in ?
References in periodicals archive ?
Tenders are invited for design-build project includes 0.29 cy unclassified excavation; 0.29 cu borrow excavation; 0.55 tn portland cement for cement treated base course; 2.90 tn asphalt concrete base course; 0.327 sy portland cement concrete pavement; 0.98 cy structural concrete.
Tenders are invited for 3,256 SY removal of asphalt pavement, 1,249 CY unclassified excavation, 2,601 CY granular material, 8,173 tn hot mix asphalt, 2,024 ultra-thin asphalt pavement, 4" wide thermoplastic edge stripe, 20 tn agricultural limestone, 10 tn commercial fertilizer (13-13-13), 10 ac seeding, 20 tn vegetative materials for mulch.
Tenders are invited for works include construction of stormwater management facilities consisting of a wet detention pond and an infiltration basin and restoration of a drainageway; including storm sewer, grading, unclassified excavation, restoration of the work area, and other miscellaneous items.
Tenders are invited for work includes approx 800 lf fencing; 1.500 sy asphalt pavement removal; 680 cy unclassified excavation; 350 cy borrow excavation; 500 cy undercut excavation; 500 lf silt fence; 1,000 lf concrete curb & gutter removal & replacement; 2 sf of 4" concrete sidewalk; 1,000 lf of 4" pavement markings; 350 lf of 8~ chain link fence; 2,500 sy sodding; 45 lf of 15" rcp, 415 lf of 8" pvc pipe.
Tenders are invited for work includes removal of curb and gutter, sanitary sewer and force main, sanitary sewer submersible lift station, above grade valve vault, switch gear frame and electrical work, removal/abandonment of lift station, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway, concrete sidewalk, asphaltic concrete pavement and restoration.
Tenders are invited for parallel taxiway a phase iv including 3,600 cy unclassified excavation; 37,150 cy borrow embankment off-site; 1,360 cy crushed aggregate base course; 5~x15~ concrete box culvert; 1,980 cy crushed aggregate base course; 780 ton bituminous surface course; 5,300 lf 8-5kv cable in trench or duct; 33 each medium intensity taxiway lights; lighted runway closure markers; 360 cy undercut excavation and backfill; 4,240 sy erosion control blanket; 5,900 sy temporary seeding and mulching; 70 lf 12" rcp storm sewer; pipe for storm drains and culverts; manholes, catch basins, inlets and inspection holes.
Tenders are invited for work includes approx 4,438 cy of unclassified excavation; 2,567 cy of trench excavation and backfill; 496 sy of 9" dowel jointed portland cement concrete pavement; 161 lf of 18" corrugated polypropylene pipe; 586 lf of 30" corrugated polypropylene pipe; 705 lf of 48" corrugated polypropylene pipe; 1,161 lf of c-900 8" pvc pipe; 114 lf of 12" c-900 awwa 151, cl51 poly wrapped; 1,001 lf of c-900 12" pvc pipe; 90 lf of 24" steel casing; 117 lf of 6" dip awwa 151, cl 51 (rj); 4 ea fire hydrant.
Tenders are invited for work includes approx 460 lf 1/c #8 5 kv underground cable; 1,758 cy unclassified excavation; 108 sf pavement marking, waterborne; 290 lf of 3" directional bore; 1,395 cy unclassified excavation.
Tenders are invited for work includes approx 375 cy aggregate base type a; 1,100 sy separator fabric; 1,050 sy of 9" portland cement concrete pavement; 650 cy unclassified excavation; 500 cy unsuitable excavation.
Tenders are invited for 7,783 lf of removal of curb and gutter; 8,191 sy of removal of asphalt mat; 148,439 sy of removal of asphalt mat (planing); 1,511 cy of unclassified excavation; see attached file.
Tenders are invited for work includes approx 13 lf of 6" pvc pipe; 11,476 lf curb and gutter; 7,624 cy unclassified excavation; 2,607 lf trench excavation and backfill; 34,535 sy cementitious stabilized subgrade; 1,254 sy of 6" portland cement concrete driveway (hes); 23,019 sy asphalt pavement removal; 2,594 lf of 18"-30" rcp.
21 mi linear grading; 110 cy pavement repair; 233 cy asphalt concrete intermediate course, type 1; 1,854 sy sealing concrete bridge decks; 962 sy sealing concrete bridge decks; 30 cy unclassified excavation; 33 lf 6" perforated corrugated plastic pipe; 774 sy seeding and mulching; 0.110 ton commercial fertilizer.