utilization equipment

utilization equipment

Any equipment which utilizes electric energy for mechanical, heating, lighting, or similar useful purposes.
References in periodicals archive ?
In addition, of the piping leaving the meter up to the principal gas utilization equipment is above ground when entering the customer's premises, the rule do not apply.
When verifying the electric characteristics of airborne utilization equipment, engineers need to test their compliance with relative standards (for example, MIL-STD-704 for military airplanes and RTCA/DO-160 chapter 16 for civil airplanes), an appropriate programmable power source is essential to provide the required power.
Contract awarded for National Nakdong River freshwater organisms buy jawongwan bio-based building utilization equipment (ultra low temperature freezers)
* Utilization Voltage: The voltage at the line terminal of utilization equipment (e.g., at the customer plug).
China Waste Heat Utilization Equipment Industry Report, 2009-2010
Also featured are more than 20 charts with specifications on a wide range of machinery and supplies, running the gamut from Abrasive Materials to Wood Waste Utilization Equipment.
Does the definition of "electric utilization equipment" include handheld, battery-powered equipment such as electrical test equipment, handheld gas detectors, water quality meters, groundwater pumps, PDAs and cellular telephones?
Equipto (800-323-0801, www.equipto.com) is introducing several new products to its line of steel space utilization equipment for use in the factory, warehouse and locker room.
The Utilization Equipment Provides Both Renewable Electric Power And Thermal Energy To Supplement The Facilities Energy Profile And Contribute To The Districts 2035 Energy Goals.
This year's directory includes thousands of sources of hundreds of types of woodworking machinery and supplies, ranging from A (abrasives) to W (wood waste utilization equipment).
The project comprises of reconstruction of boiler heating surfaces, replacement of old burners with new low emission burners, upgrade of boilers control systems and installation works of boiler flue gas utilization equipment.The duration of the contract is expected to be 30 months and the total estimated cost of EUR 9 million.
utilization equipment and other appurtenances for the work or equipment to be furnished