work cycle

work cycle

[′wərk ‚sī·kəl]
(industrial engineering)
A sequence of tasks, operations, and processes, or a pattern of manual motions, elements, and activities that is repeated for each unit of work.
References in periodicals archive ?
It uses the valve body of the larger frame size C Series Dump Pump, which provides large dump pump flow characteristics for a faster dump cycle time yielding greater work cycle efficiency.
4 shows the relative values (marked *) of the energy components during the direct stroke of the LPIEC work cycle.
The new robots uses the company's 'EASY' software system, which allows the operator to implement a work cycle for the robot in harmony with the operations of the thermforming machine.
It is equipped with one warning and three working (two front, one rear) lights; adjustable steering column and pedal; hand grip operation; hour and resettable work cycle counters; joystick, horn and radio; and, heated cabin.
It is followed by the working cycle WC3 right after the blip start and in certain cases by on additional work cycle WC4.
She hoped implementation would reach 95 percent if paper work cycle was shortened.
In 2016 at the 26th Universal Postal Congress, the member countries are expected to adopt the new world postal strategy or roadmap for the new work cycle, commencing in 2017.
Members of the Unite and RMT unions are also unhappy about the recent switch to a three-week work cycle.
NNA - Finance Minister, Ali Hassan Khalil, said that the financial measures would be weak if the political life was not reactivated by launching the work cycle of legislative institutions.
Metso said its linings are specifically designed to absorb stress at every point of the truck work cycle, from loading to transport and on to dumping.
Housing, Utilities and Urban Development Minister Ibrahim Mehleb has signed a new cooperation protocol with Communications and Information Technology Minister Atef Helmy in order to develop and modernise the work cycle at the Housing Ministry.
Recent records show that 9,697 or more than half of the 18,000 beneficiaries of the government's cash-for-work program, ended their 15-day work cycle last Dec.