yard crane

yard crane

[′yärd ‚krān]
(mechanical engineering)
Mentioned in ?
References in periodicals archive ?
Kemme [24] examined the design of strategic yard crane systems and block layouts and their effects on terminal performance.
Two tenders for the repair of (a) Shirty Tinfani Dock Crane of year model 2002/ 2003 at Dekheila Station, also (b) of a yard crane No.
The YT then transports the container to a container yard and a yard crane (YC) in the yard picks off it from the YT and stacks it.
In traditional separate-operation method, loading operations are performed after all unloading operations are finished, and each yard trailer can only move in a closed circle between a fixed quay crane and yard crane.
For example, a loading operation of containers consists in picking up the desired container by a yard crane load it onto a yard truck and transporting it to a quay crane which will load the container on the containership.
Two tenders for the conducting the required (a) raising efficiency of the lighting of the yards at both Alexandria & Dekheila containers terminals, on turn key basis, also (b) repair of the trolley carrying the Nouel branded yard crane No.
NEW CONTRACT WITH TECHNIP Earleir, Huisman secured new contracts with Technip, a world leader in project management, engineering and construction for the energy industry, for a 500 mt yard crane and a 150 mt Flexlay System.
Tenders are invited for Replacement Of 30 T Scrap Yard Crane No.
Tenders are invited for Design, Manufacture, Supply, Installation, Testing And Commissioning Of 04 (Four) Nos Of Crane Cabin Air Conditioners For The Crane #15 Under Imf Shop And Semi Portal Crane, Cd Bay Crane #1 And Slag Yard Crane #1 Under Sms Ii Shop Of Bsl As Elaborated For " Installation Of 04 (Four) Nos Of Crane Cabin Air Conditioners For Cranes Of Ingot Mould Foundary And Sms Ii Of Bsl On Turnkey Basis
This landmark development made CT9 North the first container terminal in Hong Kong where all yard cranes are operated remotely and the stacking of containers is fully automated at yard.
Late last year, Hutchison finished the second phase of its $193 million container terminal upgrade at the port, which included a new dock and yard, as well as the installation of seven super post-Panamax cranes and 18 yard cranes.